TagPort Of Seattle(1845)
-
2001-07-16
EXH AR029205: 401 Permit Decision-Making Sea-Tac International Airport Third Runway — Final Meeting Notes, Low Flow Analysis
Final meeting notes prepared by Kate Snider of Floyd & Snider Inc. for the 401 Permit Decision-Making process for the Sea-Tac International Airport Third Runway project, dated July 16, 2001. Attendees included representatives from Washington State Department of Ecology (Ann Kenny), King County (Kelly Whiting), Port of Seattle (Keith Smith), Parametrix, EarthTech, and Aquaterra. Document -
2001-07-09
EXH AR029201: Final Meeting Notes – Low Flow Analysis, Sea-Tac Airport Third Runway, July 9, 2001
Final meeting notes prepared by Kate Snider of Floyd & Snider Inc. for the 401 Permit Decision-Making process for Seattle-Tacoma International Airport Third Runway, covering a Low Flow Analysis meeting held July 9, 2001. Attendees included representatives from Washington Department of Ecology (Ann Kenny, John Drabeck), King County (Kelly Whiting), Port Of Seattle (Keith Smith), -
2001-07-05
EXH AR029198: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Notes and Schedule Update, July 5, 2001
Final draft meeting notes from July 5, 2001 technical meeting on 401 Permit Decision-Making for the Sea-Tac Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees include Ann Kenny (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Felix Kristanovich (Foster Wheeler), Paul Fendt and Tom Atkins (Parametrix), -
2001-07-01
EXH AR010824: Port Of Seattle Memo Opposing ACC’s Motion for Stay — Declaration of Paul S. Fendt, Volume 2 of 3 (SMP Volume 3)
Port Of Seattle memo opposing Airport Communities Coalition (ACC) motion for stay in PCHB No. 01-133, Volume 2 of 3, containing Declaration of Paul S. Fendt and SMP Volume 3 materials. Includes preface to the Comprehensive Stormwater Management Plan (SMP) for Seattle-Tacoma International Airport Master Plan Update Improvements, July 2001, with replacement pages developed in -
2001-06-27
EXH AR029194: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Final Draft Technical Meeting Notes, June 25 & 27, 2001
Final draft meeting notes prepared by Rachel McCrea of Floyd & Snider Inc. for 401 Permit Decision-Making technical meetings on June 25 and June 27, 2001, regarding Sea-Tac International Airport Third Runway. Attendees included Ann Kenny and John Drabek (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Paul Fendt and Tom -
2001-06-26
Exhibit 2134 AR034353: Draft 401 Certification — Acceptable Fill Criteria Language for Third Runway Embankment
Email from Chung K. Yee to Kevin Fitzpatrick, cc Craig E. Thompson and Ann Kenny, dated June 26, 2001, transmitting draft fill criteria language for a 401 Certification related to the Port Of Seattle Third Runway embankment project. Fill criteria are based on Method A table, 3-phase model protection of ground water and surface water, -
2001-06-26
EXH AR017305: Draft 401 Certification — Acceptable Fill Criteria Language for Third Runway Embankment, Port Of Seattle
Email from Chung K. Yee to Kevin Fitzpatrick (cc: Craig E. Thompson, Ann Kenny), dated June 26, 2001, transmitting draft clean fill criteria language for the 401 Certification related to the proposed Third Runway embankment at Sea-Tac Airport. Fill criteria based on Method A table, 3-phase model protection of ground water and surface water, PQL, -
2001-06-26
Exhibit 25: Email from Chung K. Yee re Sea-Tac Third Runway Fill Criteria for 401 Water Quality Certification
Email dated June 26, 2001 from Chung K. Yee to Craig E. Thompson and Kevin Fitzpatrick (Ecology) transmitting draft fill criteria requirements for the 401 Water Quality Certification for the SeaTac Third Runway Embankment project. Attachments include: draft clean fill criteria, spreadsheets deriving surface water quality criteria and ground water cleanup levels using three-phase model -
2001-06-25
EXH AR029190: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Final Meeting Notes, Low Flow Analysis, June 25, 2001
Final meeting notes prepared by Kate Snider of Floyd & Snider Inc. for the 401 Permit Decision-Making process for the Sea-Tac International Airport Third Runway project, covering Low Flow Analysis discussions held June 25, 2001. Attendees included representatives from Washington State Department of Ecology (Ann Kenny, John Drabeck), King County (Kelly Whiting), Port of Seattle -
2001-06-25
Memorandum: Modeled Area and Hydrus Model Results Draft Interim Deliverables
A June 25, 2001 memorandum from Charles Ellingson of Pacific Groundwater Group to Keith Smith of Port Of Seattle presenting draft interim deliverables for Hydrus/Slice modeling of third runway fill at Sea-Tac Airport. The memo defines areas to be modeled by Hydrus/Slice instead of HSPF in the Miller Creek and Walker Creek basins, calculates effective