TagPollution Control Hearings Board(1532)
-
2001-11-30
EXH AR005843: Motion To Intervene by CASE in PCHB No. 01-160 (ACC v. Ecology and Port Of Seattle)
Motion to Intervene filed November 30, 2001 by Citizens Against Sea-Tac Expansion (CASE), represented by Richard A. Poulin of Smith & Lowney PLLC, in PCHB Case No. 01-160 before the Pollution Control Hearings Board for the State of Washington. The appeal is Airport Communities Coalition (ACC) v. Washington State Department of Ecology and Port Of -
2001-11-30
PCHB Doc 01-160: Order Granting Intervention — CASE in ACC v. Ecology and Port Of Seattle (§ 401 Certification No. 1996-4-02325)
Pollution Control Hearings Board (PCHB) Order Granting Intervention in case PCHB 01-160, allowing Citizens Against SeaTac Expansion (CASE) to intervene as appellant in the appeal filed by Airport Communities Coalition (ACC) challenging § 401 Certification No. 1996-4-02325 (amended-1) issued by Washington State Department of Ecology to the Port of Seattle on August 10, 2001 (re-issued -
2001-11-30
PCHB Doc 5853: Order Granting Intervention (Proposed) — CASE in ACC v. Ecology and Port Of Seattle, PCHB No. 01-160
Proposed Order Granting Intervention filed in Pollution Control Hearings Board case PCHB No. 01-160, Airport Communities Coalition (ACC) v. Washington State Department of Ecology and Port Of Seattle. Order grants the Motion to Intervene by Citizens Against Sea-Tac Expansion (CASE) as a party-intervenor. Presented by Smith & Lowney, P.L.L.C., attorney Richard A. Poulin, WSBA #27782. -
2001-11-28
EXH AR005862: ACC’s Reply on Motion to Supplement the Record on Motion for Stay — PCHB No. 01-160
ACC’s reply brief filed November 28, 2001 in PCHB No. 01-160 (Airport Communities Coalition v. State of Washington Department of Ecology and Port Of Seattle) opposing Port Of Seattle’s response to ACC’s Motion to Supplement the Record on Motion for Stay. ACC argues that Kelly Whiting (King County engineer under interagency contract with Ecology) sent -
2001-11-28
EXH AR005864: Third Declaration of William A. Rozeboom Relating to ACC’s Motion for Stay
Third declaration of William A. Rozeboom, professional civil engineer with Northwest Hydraulic Consultants, filed before the Pollution Control Hearings Board (PCHB), Case No. 01-160, Airport Communities Coalition (ACC) v. State of Washington Department of Ecology and Port Of Seattle. Declaration concerns Section 401 Certification No. 1996-4-02325 and CZMA concurrency statement. Rozeboom identifies significant technical deficiencies -
2001-11-27
EXH AR052548: Sea-Tac Third Runway Embankment Fill Modeling in Support of Low Streamflow Analysis
Report by Pacific Groundwater Group (project JE0105) prepared for Port Of Seattle, dated November 27, 2001, analyzing embankment fill modeling in support of low streamflow analysis for the Sea-Tac Third Runway. Uses HYDRUS-SLICE modeling to assess vertical infiltration through embankment fill materials (General Fill and Type 1 Fill), saturated flow beneath the fill, and effective -
2001-11-26
PCHB 01-160: Order on Motion to Reconsider Motion to Strike — ACC v. Ecology and Port Of Seattle
Pollution Control Hearings Board (PCHB) order in PCHB 01-160, Airport Communities Coalition (ACC) v. State of Washington Department of Ecology and Port Of Seattle. On reconsideration of the October 10, 2001 order granting Ecology’s motion to strike, the Board addresses inadvertent disclosure of an attorney-client privileged briefing paper prepared by Ecology NW Regional Director Ray -
2001-11-26
EXH AR005903: Port Of Seattle’s Response to ACC’s Motion to Supplement PCHB Case No. 01-160
Port Of Seattle’s response to Airport Communities Coalition (ACC) motion to supplement the record in PCHB Case No. 01-160, filed November 26, 2001. Port argues ACC’s hearsay emails and Keith Smith letter regarding revisions to the Low Streamflow Analysis do not warrant supplementing the record on the motion to stay. Document addresses HSPF groundwater model -
2001-11-26
EXH 300: Third Declaration Paul S. Fendt — ACC v. Ecology, PCHB No. 01-160
This legal declaration by stormwater engineer Paul S. Fendt, filed before Washington's Pollution Control Hearings Board, addresses the Port of Seattle's Master Plan Update and its potential impacts on local stream flows in Miller, Walker, and Des Moines Creeks near Sea-Tac Airport. Fendt explains the use of the HSPF hydrologic model and a 2-year, 7-day low flow standard to assess and mitigate summer streamflow impacts resulting from planned airport expansion projects. He concludes that revised analysis shows no significant changes to previously calculated low flow impacts. -
2001-11-26
EXH AR017588: Northwest Hydraulic Consultants Letter to U.S. Army Corps of Engineers Regarding Port Of Seattle Low Flow Mitigation, Third Runway
Letter dated November 26, 2001, from Northwest Hydraulic Consultants (on behalf of ACC, Airport Communities Coalition) to Colonel Ralph H. Graves, Ms. Muffy Walker, and Ms. Gail Terzi of U.S. Army Corps of Engineers, Seattle District, Corps Ref. No. 1996-4-02325. Identifies serious flaws in Port Of Seattle’s low flow mitigation analysis for Miller Creek, Walker