Skip to content
  • STNI
  • Statistics
    • Ops and Passengers
      • King County International Airport (Boeing Field) Annual Operations
    • Financials
    • Aviation fuel uplift in the State of Washington 2018 – 2025
      • Aviation Fuel Tax Revenue in the State of Washington 1983-2025
      • Aviation Fuel Uplift at Sea-Tac Airport
    • Air Quality Monitoring
    • Flight Tracking
      • Flow and Flight Tracks
      • Five Year Comparison
      • Busiest Hours and Days
    • SEL Noise Reports & Graphs
      • About The Permanent Noise Monitors
      • Minutes of Quiet by Noise Monitor
      • Noise Events mapped
      • Noise Events (SEL)
    • Runways
    • Employees
    • Real Estate
      • Port Properties and Trees mapped
    • Parking
  • Events
  • Protest
    • Regular Events
    • Policy
      • Legislative Agenda 2027
      • Airport mitigation for the twenty first century
      • Port Dracula
    • Complain about a particular flight
    • Advocacy Organizations
    • Media Outlets
    • People
    • The Port of Seattle
      • Commission Meetings
      • Public Records Requests
      • StART
      • Highline Forum
    • Contact Your Electeds
  • Resources
    • FAQs
      • FAA Occurrences/Accidents/Indents
    • The SAMP
      • SAMP Public Comment Template
        • Two versions of Appendix K: NEPA/SEPA 2018 vs 2023
      • SAMP NTP: 31 projects by the numbers
      • SEPA Draft EIS (2026)
      • SAMP Record of Decision/FONSI (2025)
      • SAMP Draft EA (October 2024)
      • 2018 Scoping
    • Port Packages
      • Port Package Property Costs
      • Port Packages mapped
      • The Port Package Explainer
      • So you want a (first-time) Port Package? Start here
      • Port Package Looker Upper
      • How do I determine if I have a Port Package or Avigation Easement?
      • Progress on Port Package Update legislation
      • Having a Port Package Problem?
      • Port Package Site Visit Follow-Up
    • Document Library
    • Explainers
      • The Airport Law Cheat Sheet
      • The Grant Explainer
    • External Articles
    • History
      • Timeline
      • The Sea-Tac Communities Plan
        • Sea-Tac Communities Plan – Planning Maps
      • PSRC Third Runway Decision Process
    • Studies
    • Videos
  • Stories
  • Mission
  • Subscribe
  • Contact
Scroll down to content

Get InformedStay Informedx

I understand that you will never share my information with anyone, you will only use it to keep me updated on relevant events and that I may unsubscribe at any time.

STNI

STNISea-Tac Noise.Info

  • Solve for Sea-Tac. Solve for every airport.
  • Since 2016, working to obtain justice for everyone living under the flight path.
  • Less Noise. Cleaner Air. Better Public Health. Compensation.
  • Everything you think you know about the airport is wrong.

TagEcology(788)

Advanced Search Options

  • Dates
  • Media
    • External Articles
    • Images
    • PDFs
    • Video
    • Audio
  • Order By
  • 2001-08-03

    Exhibit 451: Water Quality Certification #1996-4-02325 Draft — Operational Stormwater Requirements (Pages 16–17)

    This August 2001 draft document outlines Water Quality Certification conditions (#1996-4-02325) governing stormwater management at Seattle-Tacoma International Airport (Sea-Tac). It sets requirements for the Port of Seattle to implement and maintain a Comprehensive Stormwater Management Plan, including retrofitting existing impervious surfaces, meeting state water quality standards, and obtaining Ecology approval before discharging stormwater to receiving waters. The document also addresses scheduling, flow control benchmarks, and the use of all known available and reasonable treatment methods (AKART) for runoff from impervious surfaces.
    TagsACC, Ecology, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third Runway, Water QualityFolderBox 09
  • 2001-08-03

    EXH AR024388: King County Review Comments Low Flow Impact Analysis & Offset Facility Proposal, Jul 2001

    In August 2001, King County's Department of Natural Resources submitted a technical review letter to the Washington Department of Ecology evaluating the Port of Seattle's Low Flow Impact Analysis and proposed offset facilities for stormwater management near Sea-Tac Airport. The review found the proposal goes well beyond the basic requirements of the King County Surface Water Design Manual and represents substantial mitigation for low flow impacts in affected drainage basins, including Miller and Walker Creeks. Reviewers noted several inconsistencies and data gaps in the documentation and recommended that a final consolidated document be prepared incorporating all corrections and technical memoranda.
    TagsACC, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third RunwayFolderBox 10
  • 2001-08-03

    EXH AR024406: Water Quality Cert #1996-4-02325 Draft Operational Stormwater Requirements pp.16–17

    This August 2001 draft document outlines Water Quality Certification conditions for Sea-Tac International Airport (STIA), requiring the Port of Seattle to implement a Comprehensive Stormwater Management Plan covering treatment, flow control, and retrofitting of stormwater facilities. Key requirements include obtaining Ecology approval before discharging operational stormwater to state waters, conducting a Water Effects Ratio Study, and ensuring all runoff from impervious surfaces is treated using all known available and reasonable treatment methods. The Port must also retrofit existing stormwater facilities at a rate proportional to new impervious surface construction, with progress documented in quarterly reports.
    TagsACC, Ecology, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third Runway, Water QualityFolderBox 10
  • 2001-08-03

    EXH 1268: King County DNR Letter to Ecology STIA Comprehensive Stormwater Management Plan

    In August 2001, King County's Department of Natural Resources wrote to the Washington Department of Ecology confirming that the Port of Seattle's Comprehensive Stormwater Management Plan for Sea-Tac International Airport Master Plan improvements met the technical requirements of the 1998 King County Surface Water Design Manual. The review found that the plan demonstrated a feasible conceptual strategy for managing stormwater from proposed airport construction projects. Reviewers noted that while the plan showed compliance with design standards, additional oversight and monitoring would be needed as individual projects moved from planning into construction.
    TagsACC, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport, Stormwater, Third RunwayFolderBox 21
  • 2001-08-03

    EXH AR018276: Draft 401 Conditions for Port Of Seattle NRMP Auburn Mitigation Site — Memorandum from Katie Walter to Ann Kenny

    Deliberative memorandum dated August 3, 2001 from Katie Walter (Shannon & Wilson, Inc.) to Ann Kenny (Washington State Department of Ecology), transmitting revised draft 401 conditions for the Port Of Seattle Natural Resources Mitigation Plan (NRMP) Auburn Mitigation Site. Document 21-1-12020-001-M1 REVISED.doc covers Auburn Mitigation Site revisions including culvert placement issues on June 28, 2001
    TagsACC, Army Corp of Engineers, Auburn Wetland, Ecology, Pollution Control Hearings Board, Port Of Seattle, Water QualityFolderBox 08
  • 2001-08-03

    EXH AR050909: King County Review Comments on Port Of Seattle Low Flow Impact Analysis – Flow Impact Offset Facility Proposal, July 2001

    Letter dated August 3, 2001 from King County Department of Natural Resources Director Pam Bissonnette to Ann Kenny, Senior Permit Specialist, Washington Department of Ecology Northwest Regional Office, transmitting King County’s technical review comments on the Port Of Seattle’s Low Flow Impact Analysis – Low Flow Impact Offset Facility Proposal (July 2001). The enclosure provides
    TagsACC, Ecology, King County, Miller Creek, Pollution Control Hearings Board, Port Of Seattle, StormwaterFolderBox 21
  • 2001-08-03

    EXH AR018283: Email from Katie Walter to Ann Kenny Regarding Fish/Stream Monitoring Plan

    Email dated August 3, 2001 from Katie Walter (KLW@shanwil.com) to Ann Kenny, cc Erik Stockdale, regarding fish and stream monitoring recommendations for Port Of Seattle mitigation area. Discusses IBI (Index of Biotic Integrity) methodology limitations and augmentation with monitoring of temperature, turbidity, channel morphology, substrate quality, large woody debris, riparian canopy cover, and fish use.
    TagsACC, Ecology, Environment, Pollution Control Hearings Board, Port Of Seattle, Water QualityFolderBox 08
  • 2001-08-03

    EXH AR017574: King County Letter to Ecology on Port Of Seattle Comprehensive Stormwater Management Plan for Sea-Tac Airport Master Plan Improvements

    Letter dated August 3, 2001 from Pam Bissonnette, Director of King County Department of Natural Resources, to Ann Kenny, Senior Permit Specialist at Washington Department of Ecology Northwest Regional Office, conveying King County’s technical review findings on the Port Of Seattle’s Comprehensive Stormwater Management Plan (SMP) for Master Plan Update (MPU) Improvements at Seattle-Tacoma International
    TagsACC, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport, StormwaterFolderBox 08
  • 2001-08-03

    EXH AR017264: Email Chain RE: Deliberative Draft 401 WQC for Third Runway — Drabek to Kenny

    Email chain between John Drabek and Ann Kenny (Washington State Department of Ecology) dated August 3, 2001, regarding a preliminary deliberative draft Section 401 Water Quality Certification (WQC) for the Sea-Tac Airport Third Runway. Drabek raises question about RCW 90.48 required AKART implementation in NPDES permit reissuances and integration with the 401. Kenny’s original email
    TagsACC, Ecology, NPDES, Pollution Control Hearings Board, Port Of Seattle, Third Runway, Water QualityFolderBox 08
  • 2001-08-03

    EXH AR023795: PDA Request Low Flow Analysis — Helsell Fetterman to Ecology

    In this August 3, 2001 email, Andrea Grad, a paralegal at Helsell Fetterman, submits a Public Disclosure Act (PDA) request to Ann Kenny at the Washington State Department of Ecology. Grad notes that several sections of the Port of Seattle's two-volume Low Flow Analysis — including the Introduction and the section on Determination of Impacts to Streamflow — were either incomplete or entirely missing from the copy provided by Ecology. She asks Ecology to confirm whether the Port had submitted the missing sections, and requests copies of any such materials.
    TagsACC, Ecology, PCHB, Pollution Control Hearings Board, Port Of Seattle, Public Records, Third RunwayFolderBox 10

Posts pagination

Page 1 … Page 39 Page 40 Page 41 Page 42 Page 43 … Page 79
Sidebar On/Off

Upcoming Events

  • Part 150 NCP Workshop — Burien
    Add to CalendarMSaturday Oct 17: 10:00am

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]
  • Part 150 NCP Workshop — SeaTac
    Add to CalendarMMonday Oct 19: 6:00pm

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]
  • Part 150 NCP Workshop — Des Moines
    Add to CalendarMTuesday Oct 20: 6:00pm

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]

[See all...]


Issues

Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already hear, but you’re probably not aware of what it all means. Here’s what you need to know.
read more...

Read This!

As the source for federal transportation grants, the Puget Sound Regional Council was charged with developing a system to meet the growing need for commercial aviation. When the search for a second airport failed, they authorized the Port of Seattle to build the Third Runway, with a mandate to develop a noise abatement and mitigation program. In their effort to stop the Third Runway, the ACC argued over every detail of the Port's efforts--including property buyouts and sound insulation. The dispute was meant to be settled by a three member Expert Arbitration Panel. This is their final report. It finds 2-1, that the Port's program was insufficient in several respects. Despite that, funding for the Third Runway was approved by the PSRC, and the 'Port Package' program, proceeded largely unchanged. Expert Arbitration Panel's final decision finding that the Port of Seattle had not shown sufficient reduction in real on-the-ground noise impacts to satisfy noise reduction conditions required for approval of a third runway at Sea-Tac International Airport. The majority decision concluded the Port's noise abatement programs were insufficient despite being impressive in scope.
continue...

  • Sea-Tac Noise.Info
  • Connect with STNI

    • Subscribe
    • Port Package Problem?
    • Donate
    • Podcast
    • Socials
      • Facebook
      • X (Twitter)
      • Bluesky
      • Instagram
  • Learn

    • Frequently Asked Questions
    • Explainers
    • Youtube
    • Research Requests
    • Complain about one flight
  • Goals

    Fulfill the promises of 1976:
    • Compensation
    • Reduced noise
    • Improved air quality
    • Environmental remediation
Login/Register
©2026•Data Privacy

Message

We use cookies to provide basic functionality. We also provide access to search engines in order to provide site analytics. We do not sell or share your data.
V V