TagThird Runway(1067)
-
2000-10-27
Exhibit 218: Sea-Tac Airport Third Runway 401 Permit Negotiations — Draft Meeting Notes, October 27, 2000
These draft meeting notes from October 27, 2000 document technical negotiations between the Port of Seattle and the Washington State Department of Ecology regarding the 401 Water Quality Permit for Sea-Tac Airport's Third Runway project. The meeting covered key stormwater management topics including detention sizing, base flow impacts, and the Tyee Pond buffer, with participants tracking a master list of technical issues requiring resolution before the permit could be issued. The notes reflect ongoing discussions between agency staff, Port representatives, and engineering consultants to resolve stormwater modeling, hydrology, and environmental compliance questions. -
2000-10-27
EXH AR023808: Draft Meeting Notes — STIA Third Runway 401 Permit Negotiations, Oct 27, 2000
These draft meeting notes from October 27, 2000 document technical negotiations between the Port of Seattle and the Washington Department of Ecology regarding the 401 water quality permit for the Sea-Tac Airport Third Runway project. The meeting covered topics including stormwater management planning, base flow impacts, Tyee Pond buffer requirements, and staffing for permit review. A master list of technical issues was maintained to track which items had been resolved, were pending additional information, or required further discussion. -
2000-10-27
EXH AR023816: STIA Third Runway 401 Permit Negotiations Final Draft Meeting Notes Oct 27 2000
These are meeting notes from a October 27, 2000 negotiation session between the Port of Seattle and the Washington Department of Ecology regarding the 401 Water Quality Permit for Sea-Tac Airport's Third Runway project. The meeting covered technical issues including stormwater management planning, base flow impacts, and the Tyee Pond buffer, with participants tracking the resolution status of dozens of environmental compliance items. A jointly maintained master list of issues was used to document which technical concerns had been resolved, were pending additional information, or required further discussion before the permit could be issued. -
2000-10-26
EXH AR023667: Email Chain STIA Agreed Order and Remedial Action Grant
This October 2000 email chain between Washington State Department of Ecology staff discusses coordination efforts regarding the Port of Seattle-SeaTac International Airport Agreed Order (A.O.) and Remedial Action Grant (RAG). The team planned a November meeting with Port of Seattle representatives to confirm completed cleanup work, agree on remaining scope, and address grant-related issues. Key action items included transmitting a Responsiveness Summary to the Port, reviewing billing records, and briefing the Ecology 401 Certification team on progress. -
2000-10-26
EXH 381: Third Runway Embankment Infiltration Memorandum
A 2000 engineering memorandum from HNTB and Hart Crowser advises the Third Runway Design Team against artificially increasing stormwater infiltration within the proposed runway embankment. The memo warns that enhanced infiltration would raise risks of slope instability, soil liquefaction during earthquakes, and long-term maintenance problems that could not be remedied once the embankment was built. The engineers concluded that these safety and structural risks outweighed any stormwater detention benefits that increased infiltration might provide. -
2000-10-26
Exhibit 89: FW: 3rd Runway Notes and Next Meetings — Ecology Internal Comments on 401 Certification Issues
Exhibit 89 (AR 017784-017785). Email chain forwarded by Raymond Hellwig (Ecology) to Ann Kenny on October 26, 2000, containing internal comments by Tom Luster (Ecology) on draft 10/20/2000 meeting notes for the Sea-Tac Airport third runway 401/404 review. Luster raises concerns about: NPDES major modification and stormwater plan for SR-509 interchange; South Access/Tyee Pond spill -
2000-10-26
EXH AR023742: Internal Deliberative Notes — NAMP/SMP Consistency, Cumulative Impacts, South Access Road, Mitigation
These are internal deliberative notes from a telephone conversation with Ray Hellwig on October 26, 2000 at 4:50 p.m., discussing the need for consistency between the NAMP and SMP programs, concerns about underestimating the difficulty of technical review, and a decision deadline set for the end of January. The notes also address cumulative impacts described as 'reasonably foreseeable,' a South Access Road and Tyee Pond condition related to DOT and subsequent development, a refusal to permit SAR, consultant oversight of mitigation implementation, and contingency mitigation at a multiplied ratio. -
2000-10-25
EXH AR023737: Ecology Draft Talking Points — Staff Changes STIA Third Runway 401 WQ Permit Review
In October 2000, Washington State Department of Ecology prepared internal talking points to explain staff changes in the environmental review of the Sea-Tac Airport Third Runway project, including shifting the 401 water quality permit review from Olympia headquarters to the Bellevue regional office and replacing the senior wetlands specialist with an outside consultant. Ecology emphasized that these were routine workforce-management decisions driven by competing project demands, not outside pressure. The agency maintained that its responsibility to ensure the Third Runway met state environmental protection laws — covering stormwater, wetlands, in-stream flow, and clean fill — remained unchanged. -
2000-10-25
EXH AR046081: Port Of Seattle Letter to U.S. Army Corps of Engineers — CWA Section 404 Permit Application (JARPA) for STIA Master Plan Update Projects
Letter dated October 25, 2000 from Elizabeth Leavitt, Manager of Aviation Environmental Programs, Port of Seattle, to Jonathan Freedman, Regulatory Branch, U.S. Army Corps of Engineers Seattle District, submitting a new Joint Aquatic Resources Permit Application (JARPA) for Clean Water Act Section 404 permit, Corps of Engineers Project No. 96-4-02325, for Seattle-Tacoma International Airport Master -
2000-10-25
EXH AR023741: Draft Memo — Transition 401 Review STIA
A October 25, 2000 internal memo from Tom Luster to Ann Kenny outlines the transition of the 401 water quality certification review for the Sea-Tac Airport expansion project. It covers key outstanding issues including flow augmentation, water quality BMPs, and Clean Air Act compliance, as well as coordination needs with the Army Corps of Engineers, EPA, and WDFW. The memo also addresses document management, public disclosure requests, and contract administration changes related to the King County Stormwater Review.