Skip to content
  • STNI
  • Statistics
    • Ops and Passengers
      • King County International Airport (Boeing Field) Annual Operations
    • Financials
    • Aviation fuel uplift in the State of Washington 2018 – 2025
      • Aviation Fuel Uplift at Sea-Tac Airport
    • Air Quality Monitoring
    • Flight Tracking
      • Flow and Flight Tracks
      • Five Year Comparison
      • Busiest Hours and Days
    • SEL Noise Reports & Graphs
      • About The Permanent Noise Monitors
      • Minutes of Quiet by Noise Monitor
      • Noise Events mapped
      • Noise Events (SEL)
    • Runways
    • Employees
    • Real Estate
      • Port Properties and Trees mapped
    • Parking
  • Events
  • Protest
    • Regular Events
    • Legislation 2026
    • Complain about a particular flight
    • Advocacy Organizations
    • Media Outlets
    • People
    • The Port of Seattle
      • Commission Meetings
      • Public Records Requests
      • StART
      • Highline Forum
    • Contact Your Electeds
  • Resources
    • FAQs
      • FAA Occurrences/Accidents/Indents
    • The unSustainable Airport Master Plan
      • SAMP Public Comment Template
        • Two versions of Appendix K: NEPA/SEPA 2018 vs 2023
      • SAMP NTP: 31 projects by the numbers
      • SEPA Draft EIS (2026)
      • SAMP Record of Decision/FONSI (2025)
      • SAMP Draft EA (October 2024)
      • 2018 Scoping
    • Port Packages
      • Port Package Property Costs
      • Port Packages mapped
      • The Port Package Explainer
      • So you want a (first-time) Port Package? Start here
      • Port Package Looker Upper
      • How do I determine if I have a Port Package or Avigation Easement?
      • Progress on Port Package Update legislation
      • Having a Port Package Problem?
      • Port Package Site Visit Follow-Up
    • Document Library
    • Explainers
      • The Airport Law Cheat Sheet
      • The Grant Explainer
    • External Articles
    • History
      • Timeline
      • The Sea-Tac Communities Plan
        • Sea-Tac Communities Plan – Planning Maps
      • PSRC Third Runway Decision Process
    • Studies
    • Videos
  • Stories
  • Mission
  • Subscribe
  • Contact
Scroll down to content

Get InformedStay Informedx

I understand that you will never share my information with anyone, you will only use it to keep me updated on relevant events and that I may unsubscribe at any time.

STNI

STNISea-Tac Noise.Info

  • Solve for Sea-Tac. Solve for every airport.
  • Since 2016, working to obtain justice for everyone living under the flight path.
  • Less Noise. Cleaner Air. Better Public Health. Compensation.
  • Everything you think you know about the airport is wrong.

TagPort Of Seattle(2611)

Advanced Search Options

  • Dates
  • Media
    • External Articles
    • Images
    • PDFs
    • Video
    • Audio
  • Order By
  • 1999-11-12

    EXH AR043120: Supplemental Airport Site Wetland and Stream Analysis

    Parametrix, Inc. prepared this Supplemental Airport Site Wetland and Stream Analysis for Port Of Seattle, dated November 12, 1999 (AR 043120). The report analyzes wetland and stream conditions at three supplemental airport candidate sites — Arlington, Lake Sawyer, and Frederickson — comparing 1994 MSA study findings with 1998 field-verified wetland boundary data. Includes tables comparing
    TagsACC, Environmental Impact Statement, NEPA, Pollution Control Hearings Board, Port Of Seattle, Second AirportFolderBox 18
  • 1999-11-12

    EXH AR043136: Subsurface Conditions Data Report, Phase 3 Fill, Third Runway Embankment, Sea-Tac Airport

    Hart Crowser subsurface conditions data report (J-4978-16) prepared for HNTB and Port Of Seattle, dated November 12, 1999, regarding Phase 3 Fill for the Third Runway embankment at Seattle-Tacoma International Airport. Report covers generalized geologic and subsurface soil conditions, hydrogeologic conditions, field explorations (auger borings HC99-B61, HC99-B63, HC99-B65, HC99-B71, HC99-B73), test pits HC99-TP26 through HC99-TP44,
    TagsACC, Fill Dirt, Pollution Control Hearings Board, Port Of Seattle, soil, Third RunwayFolderBox 18
  • 1999-11-01

    EXH AR041945: Des Moines Creek Regional Capital Improvement Project Preliminary Design Report — Alternative Analysis Addendum

    Addendum to the Des Moines Creek Regional Capital Improvement Project Preliminary Design Report, prepared November 1, 1999 by King County Capital Improvement Project Design Team for the Des Moines Creek Basin Committee. Prepared for Tim Heydon (City of Des Moines), Tom Hubbard (Port Of Seattle), David Masters (King County), Don Monaghan (City of SeaTac), and
    TagsACC, City Of SeaTac, Des Moines, Des Moines Creek, King County, Pollution Control Hearings Board, Port Of SeattleFolderBox 18
  • 1999-10-28

    EXH AR026497: Aquatic Research Inc Lab Analysis — Water Samples (PAR025-18)

    A October 1999 laboratory analysis report from Aquatic Research Incorporated details water sample testing conducted for Parametrix/Port of Seattle. One water sample collected on October 8-11, 1999 was tested for total suspended solids, petroleum hydrocarbons (diesel and motor oil), and total metals including cadmium, copper, lead, and zinc. Results showed low levels of contaminants, with zinc detected at 0.102 mg/l and copper at 0.0070 mg/l, while diesel and motor oil levels fell below detection limits.
    CategoriesCorrespondence TagsACC, Environment, PCHB, Pollution Control Hearings Board, Port Of Seattle, Third Runway, Water QualityFolderBox 10
  • 1999-10-21

    EXH AR042698: Sea-Tac Airport Dissolved Oxygen Deicing Study and Ecology Response Letter

    Dissolved Oxygen Deicing Study prepared by Cosmopolitan Engineering Group for Port Of Seattle Sea-Tac International Airport (AR042698, August 1999), examining impacts of de-icing agents from airport stormwater runoff on Miller Creek and Des Moines Creek, including BOD5 discharges to NW Ponds and Lake Reba. Accompanied by Washington State Department of Ecology (NWRO) response letter dated
    TagsACC, Deicing, Des Moines Creek, Ecology, Pollution Control Hearings Board, Port Of Seattle, Water QualityFolderBox 18
  • 1999-10-21

    EXH AR023797: Ecology Letter – Dissolved Oxygen De-Icing Study Final Draft, STIA

    In this October 1999 letter, the Washington State Department of Ecology reviewed a study by the Port of Seattle examining how de-icing chemicals used at Sea-Tac International Airport affect water quality in Miller and Des Moines Creeks. Ecology found significant deficiencies in the study, including incorrect water quality classifications, too few de-icing events sampled, and inadequate monitoring methods, concluding that dissolved oxygen levels in both creeks frequently failed to meet applicable standards. The agency requested that the Port resubmit the study with corrections before a determination could be made about whether de-icing operations were being properly managed to protect local waterways.
    TagsACC, Deicing, Des Moines Creek, Ecology, Pollution Control Hearings Board, Port Of Seattle, Water QualityFolderBox 10
  • 1999-10-08

    EXH AR043079: Hart Crowser Memorandum — Sea-Tac Airport Third Runway Probabilistic Seismic Hazard Analysis Results

    Hart Crowser memorandum from Michael Bailey, Allen Jones, and Doug Lindquist to Jim Thomson (HNTB), dated October 8, 1999, presenting probabilistic seismic hazard analysis (PSHA) results for the Sea-Tac Airport Third Runway project (J-4978-14). Reports peak horizontal acceleration (PHA) values for common design return intervals: 0.16 g (72-year), 0.36 g (475-year), 0.47 g (975-year), and
    TagsACC, Earthquake, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport, Third RunwayFolderBox 18
  • 1999-09-24

    EXH AR042987: Subsurface Conditions Data Report, Borrow Areas 1, 3, and 4, Sea-Tac Airport Third Runway

    Hart Crowser subsurface conditions data report (project J-4978.02) prepared for HNTB and Port Of Seattle, dated September 24, 1999, covering Borrow Areas 1, 3, and 4 for the Sea-Tac Airport Third Runway project. Report includes generalized geologic conditions, subsurface soil conditions, hydrogeologic regime, groundwater elevation data, and perched water-bearing zone analysis. Field explorations used dual-wall
    TagsACC, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport, soil, Third RunwayFolderBox 18
  • 1999-09-20

    EXH AR024773: Parametrix Memo — Review of 1999 Annual Stormwater RP, STIA

    A September 20, 1999 internal memorandum from Parametrix, Inc. consultants to Scott Tobiason provides technical review comments on the first draft of the 1999 Annual Stormwater Report for Seattle-Tacoma International Airport (STIA). The memo raises concerns about consistency in water quality comparators, statistical methods for 'trimmed' data sets, and the attribution of reduced sediment levels to construction wheel wash versus other factors. It also flags regulatory issues regarding mixing zones, water quality standards language, and potential NPDES permit compliance implications of identifying pollution sources in the annual report.
    TagsACC, NPDES, PCHB, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third RunwayFolderBox 10
  • 1999-09-17

    Exhibit 165: RE: Sea-Tac Third Runway — 401 Certification Timing and Governor’s Commitment

    Email chain from Raymond Hellwig (Washington State Department of Ecology) to Thomas Fitzsimmons and Bill Alkire, cc’ing Carol Jolly, Ron Langley, Tom Luster, Kevin Fitzpatrick, Dave Garland, Erik Stockdale, Roger Nye, and Paul David Carr, dated September 17, 1999. Discusses Governor’s reported commitment to Sea-Tac legislators (Paterson et al.) that the Section 401 Water Quality
    TagsACC, Clean Water Act, Ecology, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport, Third RunwayFolderBox 08

Posts pagination

Page 1 … Page 219 Page 220 Page 221 Page 222 Page 223 … Page 262
Sidebar On/Off

Upcoming Events

  • StART SEA Stakeholder Advisory Round Table
    Add to CalendarMWednesday Aug 26, 5:00pm - 7:00pm
    Zoom (Virtual Meeting)
    START meetingagenda 2026826 final 0 pdf

    Meeting Objectives Introduce the primary feedback themes identified by StART members regarding StART’s Operating Procedures and determine areas that may warrant future discussion. 5:00 PM – Welcome Meeting Management Welcome Lead: Andrés Mantilla, Facilitator, Uncommon Bridges; Wendy Reiter, Airport Managing Director, POS 5:15 PM – Dinner: All participants eat. 5:30 PM – StART Operating Procedures

    [...]
  • Commercial Aviation Work Group
    Add to CalendarMThursday Sep 3, 10:00am - 1:30pm
    Virtual Meeting (Zoom)
    Cawg agenda sep 3 26 virtual pdf

    Meeting Agenda 10:00 a.m. – 10:15 a.m. | Welcome – Evan Nordby, Chair a. Introductions and Agenda Reviewb. Status of appointments and non-voting member invitationsc. Other updates as necessary 10:15 a.m. – 11:00 a.m. | Is it practical and legal to operate the western Washington [Puget Sound] airports as a single airport system? – Consultant

    [...]

[See all...]


Help study childhood asthma. Get free HEPA filter!

read more...

Issues

Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already hear, but you’re probably not aware of what it all means. Here’s what you need to know.
read more...

Read This!

As the source for federal transportation grants, the Puget Sound Regional Council was charged with developing a system to meet the growing need for commercial aviation. When the search for a second airport failed, they authorized the Port of Seattle to build the Third Runway, with a mandate to develop a noise abatement and mitigation program. In their effort to stop the Third Runway, the ACC argued over every detail of the Port's efforts--including property buyouts and sound insulation. The dispute was meant to be settled by a three member Expert Arbitration Panel. This is their final report. It finds 2-1, that the Port's program was insufficient in several respects. Despite that, funding for the Third Runway was approved by the PSRC, and the 'Port Package' program, proceeded largely unchanged. Expert Arbitration Panel's final decision finding that the Port of Seattle had not shown sufficient reduction in real on-the-ground noise impacts to satisfy noise reduction conditions required for approval of a third runway at Sea-Tac International Airport. The majority decision concluded the Port's noise abatement programs were insufficient despite being impressive in scope.
continue...

The Podcast!

Subscribe to the only podcast devoted to policies, politics, history, impacts for people living under the flight path everywhere. It’s definitely not just about noise!
  • Sea-Tac Noise.Info
  • Connect with STNI

    • Subscribe
    • Port Package Problem?
    • Donate
    • Podcast
    • Socials
      • Facebook
      • X (Twitter)
      • Bluesky
      • Instagram

    "Letter regarding draft Regional Airport System Plan, 1980 to 2000" — , 1981

  • Learn

    • Frequently Asked Questions
    • Explainers
    • Youtube
    • Research Requests
    • Make a complaint
  • Goals

    Fulfill the promises of 1976:
    • Compensation
    • Reduced noise
    • Improved air quality
    • Environmental remediation
Login/Register
©2026•Data Privacy

Message

We use cookies to provide basic functionality. We also provide access to search engines in order to provide site analytics. We do not sell or share your data.
V V