2000-05-23
EXH AR018449: Sea-Tac Internal Meeting Notes — Wildlife Hazard Plan, Easements, Groundwater Model, Cumulative Impacts
Handwritten notes from a SeaTac internal meeting on 5-23-00 (AR 018449, Exhibit 180), attended by Jeannie, Ray H., Tom L., Joan M., John Glynn, Kevin P., and Paula Chlos. Topics include resolving conflicts between wildlife hazard plan and mitigation plan, sideboard definitions needed; need for ETA statement on conflict with circular and whether it meets -
2000-05-22
EXH AR044677: Port Of Seattle Letter Withdrawing and Resubmitting CZMA Consistency Statement for Sea-Tac Airport Third Runway
Letter dated May 22, 2000 from Elizabeth Leavitt, Manager of Aviation Environmental Programs at Port Of Seattle, to Tom Luster at Washington Department of Ecology (Environmental Coordination Section), withdrawing the December 6, 1999 CZMA Consistency Statement and simultaneously submitting a new one to reset the six-month review period under 33 C.F.R. Sec. 325.2. The withdrawal -
2000-05-19
EXH AR017773: Internal Email — Sea-Tac Third Runway Decision-Making Timeline and Workload Management
Email from Raymond Hellwig to Thomas Fitzsimmons dated May 19, 2000, regarding the SeaTac Third Runway permitting process and July 2000 decision-making timeframe. Discusses King County review of Port Of Seattle stormwater management plan requiring up to 10 more weeks, internal staff meetings to develop a definitive issues list, drafting 401 language for resolved issues, -
1999-11-12
EXH AR043120: Supplemental Airport Site Wetland and Stream Analysis
Parametrix, Inc. prepared this Supplemental Airport Site Wetland and Stream Analysis for Port Of Seattle, dated November 12, 1999 (AR 043120). The report analyzes wetland and stream conditions at three supplemental airport candidate sites — Arlington, Lake Sawyer, and Frederickson — comparing 1994 MSA study findings with 1998 field-verified wetland boundary data. Includes tables comparing -
1999-08-01
EXH AR042630: Draft Wetlands Re-Evaluation Document — STIA Master Plan Update Improvements
Draft Wetlands Re-Evaluation Document prepared by Port Of Seattle in August 1999 for Seattle-Tacoma International Airport (STIA) Master Plan Update Improvements. Addresses new information on wetlands and aquatic resources affected by the planned new third runway and related improvements, not available during preparation of the 1996 Final Environmental Impact Statement (FEIS) or 1997 Final Supplemental -
1999-07-01
EXH AR042527: Subsurface Conditions Data Report — 404 Permit Support, Third Runway Embankment
Hart Crowser subsurface conditions data report prepared for HNTB Corporation and Port Of Seattle, project J-4978-06, July 1999, supporting 404 permit for Third Runway embankment at Sea-Tac Airport. Covers generalized geologic and hydrogeologic conditions, subsurface soil conditions, hydraulic conductivity estimates, slug testing, water level data, SPT borings (HC99-B31 through HC99-B47), test pits (HC99-TP1 through HC99-TP21, -
1998-09-02
EXH AR041825: FAA Letter to U.S. Army Corps of Engineers Regarding Port Of Seattle Third Runway Wetland Mitigation
FAA Northwest Mountain Region letter dated September 2, 1998, from FAA to Brian R. Applebury, Chief Operations Division, Seattle District Corps of Engineers, regarding permit application 96-4-02325 for Port Of Seattle Third Runway at Seattle-Tacoma International Airport. Letter addresses compensatory wetland mitigation, bird/aircraft strike hazard, Advisory Circular AC 150/5200-33 ‘Hazardous Wildlife Attractants on or Near -
1998-08-18
EXH AR041715: Revised Off-Site Wetland Mitigation Plan, Seattle-Tacoma International Airport Master Plan Update Improvements
Draft Revised Off-Site Wetland Mitigation Plan prepared by Parametrix, Inc. for Port Of Seattle regarding Seattle-Tacoma International Airport Master Plan Update Improvements, dated August 18, 1998 (project number 55-2912-01(03)). Document covers rationale for off-site habitat mitigation, mitigation site selection, revised project wetland impacts as of July 14, 1998, and revised mitigation plan design objectives. Includes -
1997-05-13
Final Supplemental Environmental Impact Statement for the Proposed Master Plan Update Development Actions at Seattle-Tacoma International Airport, Volume 1: Main Text and Appendices A through C-1
This 1997 Final Supplemental Environmental Impact Statement (SEIS) examines the environmental effects of proposed expansion plans at Seattle-Tacoma International Airport, including construction of a new third parallel runway, terminal improvements, and parking upgrades. The study was prompted by faster-than-expected growth in air travel demand during the mid-1990s, which exceeded earlier forecasts and required updated analysis of noise, air quality, wetland, and community impacts. The document was jointly prepared by the FAA and the Port of Seattle to ensure the proposed developments met federal and Washington State environmental policy requirements. -
1997-05-01
Final Supplemental EIS, Appendix F: DSEIS Response to Comments — Forecasts, Do-Nothing/With Project Capacity, and Forecast Ranges
This document is part of the Final Supplemental Environmental Impact Statement for Seattle-Tacoma International Airport, addressing public comments on aviation demand forecasts and runway capacity planning. It explains how the 'Do-Nothing' and 'With Project' (Third Runway) alternatives were evaluated based on projected passenger and operations data through 2010, noting that the existing airfield has a maximum capacity of 460,000 annual operations. The document also acknowledges the inherent uncertainty in long-range aviation forecasts and clarifies that neither NEPA nor SEPA require the use of worst-case data in environmental reviews.