EXH AR026627: Transmittal Form & Errata — STIA Master Plan Update Natural Resources Mitigation Plan Corrections (Jan 2002)

This January 2002 transmittal from Parametrix, Inc. to the Washington State Department of Ecology submits corrections to the Seattle-Tacoma International Airport Master Plan Update Natural Resources Mitigation Plan (NRMP, November 2001). The corrections include a revised reference list, an errata sheet fixing citation errors throughout the report, and an updated Table 3.1-4 that adjusts the total acreage of wetlands affected by mitigation activities from 43.34 to 44.36 acres. Additional text corrections clarify wetland category designations and update various reference callouts across multiple sections of the report.

Notes

Transmittal form dated January 9, 2002 from Jim Kelley of Parametrix, Inc. to Ann Kenny at the Washington Department of Ecology (NWRO), project number 556-2912-001-01-03, for the Seattle-Tacoma International Airport (STIA) Master Plan Update (MPU) permitting. Transmits: (1) Revised Section 8 References for the Natural Resources Mitigation Plan (NRMP, November 2001) correcting omitted citations; (2) Errata Sheet correcting reference callouts throughout the NRMP (pages 1-14, 3-1, 4-3 through 7-75), including corrections to Hart Crowser, FAA, Ecology, Gregory et al., Fiebig, Poulson, Knutson and Naef, Brazier and Brown, Hewlett and Fortson 1992, Mockler et al. 1998, NMFS and FWS 2001 citations; (3) Revised Table 3.1-4 correcting total acreage of wetlands disturbed during mitigation activities from 43.34 to 44.36 acres (pages 3-6 and 5-120), and correcting ‘Category III’ to ‘Category II’ on page 3-11, Section 3.1-5. AR026627, AR026628, AR026629. Sent via Express Overnight; cc Elizabeth Leavitt.

V V