Exhibit 76: Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Draft technical memorandum prepared by Associated Earth Sciences, Inc. (AESI, Project No. BV99122C) for Port Of Seattle, dated June 19, 2001, analyzing preferential ground water flow paths relative to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Evaluates potential contaminant migration from the Aviation Operations and Maintenance Area (AOMA) to the third runway construction -
2001-06-19
EXH AR17302: Email Chain RE: Acceptable Fill Criteria Language for Draft 401 Certification
Email chain (AR017302) among Washington State Department of Ecology staff Chung K. Yee, Kevin Fitzpatrick, Craig Thompson, and AAG Joan Marchioro regarding acceptable fill criteria language for the Draft 401 Water Quality Certification for the Seattle-Tacoma International Airport Third Runway project. Key issues include: whether Ecology’s 401 WQ Certification fill criteria should ‘stand alone’ from -
2001-06-19
EXH AR050641: Draft Technical Memorandum — Analysis of Preferential Ground Water Flow Paths Relative to Proposed Third Runway, STIA
Draft technical memorandum prepared by Associated Earth Sciences, Inc. (AESI, Project No. BV99122C) for Port Of Seattle, dated June 19, 2001, analyzing preferential ground water flow paths relative to the proposed Third Runway at Seattle-Tacoma International Airport (STIA). Responds to Washington Department of Ecology (Ecology) request regarding whether contaminated ground water below the Aviation Operations -
2001-06-18
EXH AR029187: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Notes, June 18, 2001
Final draft meeting notes from a 401 Permit Decision-Making technical meeting for Sea-Tac International Airport Third Runway, held June 18, 2001, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included Ann Kenny and John Drabek (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port Of Seattle), Felix Kristanovich (Foster Wheeler), Paul Fendt -
2001-06-18
EXH AR050666: Letter of Transmittal — Borrow Area 3 Wetland Protection Swale, Third Runway Project
Letter of transmittal dated June 18, 2001 from Michael Bailey, P.E. (Senior Principal, Hart Crowser) to Jim Kelley at Parametrix, Job No. 4978-06, transmitting four draft figures for the Third Runway Project Borrow Area 3 Wetland Protection Swale: Figure 1 Post-Reclamation Topography and Drainage Facilities, Figure 2 Typical Cross Sections, Figure 3 Post-Reclamation Topographical Detail, -
2001-06-18
EXH AR030796: Hart Crowser Letter of Transmittal — Borrow Area 3 Wetland Protection Swale Draft Plans, Third Runway Project
Hart Crowser Senior Principal Michael Bailey transmits revised draft plans and cross sections for the Borrow Area 3 Wetland Protection Swale (Job No. 4978-06) to Jim Kelley at Parametrix, June 18, 2001. Documents include Figure 1 (Post-Reclamation Topography and Drainage Facilities), Figure 2 (Typical Cross Sections), Figure 3 (Post-Reclamation Topographical Detail), and Figure 4 (Proposed -
2001-06-14
EXH 303: Draft Meeting Notes — Low Flow Analysis, STIA Third Runway 401 Permit, Jun 14, 2001
These draft meeting notes from a June 14, 2001 technical meeting cover the low flow stream analysis conducted as part of the 401 Permit Decision-Making process for Sea-Tac International Airport's Third Runway project. Attendees from the Department of Ecology, King County, Port of Seattle, and consulting firms identified five additional technical tasks, including verifying groundwater basin calibration parameters for Walker Creek and Des Moines Creek, documenting embankment infiltration rationale, and assessing water availability for proposed low stream flow mitigation measures. -
2001-06-14
EXH AR029185: Final Meeting Notes — Low Flow Analysis, 401 Permit Decision-Making, Sea-Tac Airport Third Runway
Final meeting notes from June 14, 2001 (1:00–4:00 PM) prepared by Kate Snider, Floyd & Snider Inc., for the 401 Permit Decision-Making process for the Sea-Tac Airport Third Runway. Attendees included Ann Kenny and John Drabeck (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port Of Seattle), Paul Fendt (Parametrix), Alan Black (HNTB), and -
2001-06-13
EXH 302: Draft Meeting Notes – Low Flow Analysis, STIA Third Runway 401 Permit, Jun 13 2001
These draft meeting notes from a June 12, 2001 technical meeting cover the Low Flow Analysis conducted as part of the 401 Permit Decision-Making process for Sea-Tac International Airport's Third Runway project. Representatives from the Washington Department of Ecology, King County, the Port of Seattle, and consulting firms discussed the status of hydrological modeling efforts, including HSPF and embankment seepage models, and outlined upcoming deliverables. The group also addressed plans for a mitigation and operational plan to evaluate and offset potential low stream flow impacts caused by the runway project. -
2001-06-13
EXH AR017301: Email on Acceptable Fill Criteria Language for Draft 401 Certification — MTCA Requirements for Sea-Tac Airport Third Runway
Internal deliberative email from Chung K. Yee to Kevin Fitzpatrick (cc: Craig E. Thompson, Curtis A. Dahlgren, Tim Nord), dated June 13, 2001, regarding acceptable fill criteria language for the Draft 401 Certification for the Seattle-Tacoma International Airport Third Runway project. Pete Kmet of HQ/TCP recommended MTCA (Model Toxics Control Act) should not be used