Notes
Email from Ching-Pi Wang (Port Of Seattle) to Paul Agid, cc Roger Nye, dated May 30, 2001, transmitting redline edits to the May 8th draft of the preferential ground-water flowpath technical memorandum related to construction of the Third Runway at Sea-Tac Airport. Attached redlined memorandum (From Port to Ecology, May 30, 2001) addresses preferential flowpaths via utility lines and perched zones, existing contamination conditions within the AOMA (Aircraft Operations and Maintenance Area), Qva aquifer contamination, MTCA compliance, and the SeaTac Runway Fill Hydrologic Studies (Pacific Ground Water Group, June 19, 2000). Document references Agreed Order of May 1999, contaminant migration distances (~550 feet), and requests narrative on underground utility depths relative to perched zone contamination.
