2002-02-01
Exhibit 706: Deposition of Thomas Luster, PCHB No. 01-160, Airport Communities Coalition v. Department of Ecology and Port Of Seattle
Deposition upon oral examination of Thomas Luster, taken February 1, 2002, in PCHB No. 01-160, Airport Communities Coalition (ACC) v. Department of Ecology and Port Of Seattle. Luster, represented by Richard A. Smith of Smith & Lowney, was deposed by Gillis E. Reavis (Marten Brown) for Port Of Seattle and Thomas J. Young (Assistant Attorney -
2002-01-31
PCHB Doc 4616: Certificate of Record — ACC v. Ecology and Port Of Seattle (PCHB 01-160)
Certificate of Record filed January 31, 2002 by Tracey L. Johnson, Clerk of the Pollution Control Hearings Board (PCHB), transmitting the complete administrative record for PCHB No. 01-160, Cause No. 01-2-02386-9, in the Superior Court of Washington, Thurston County. Airport Communities Coalition (ACC) is appellant against State of Washington Department of Ecology and Port Of -
2002-01-31
EXH 408: Supplemental Response to ACC Interrogatory No. 4 — Expert Witness Prior Experience
This January 31, 2002 letter from Foster Pepper & Shefelman attorneys transmits the Port of Seattle's supplemental response to an interrogatory filed by the Airport Communities Coalition (ACC), listing the prior expert-witness experience of the Port's designated witnesses. The document covers experts in areas such as groundwater hydrology, computer modeling of land development impacts, and FAA obstacle clearance standards, submitted in connection with the case Airport Communities Coalition v. State of Washington Department of Ecology and the Port of Seattle (PCHB No. 01-160). It is part of the administrative record related to disputes over Sea-Tac Airport's environmental and operational practices. -
2002-01-30
EXH AR004627: ACC and CASE Reply in Support of Certificate of Appealability, PCHB No. 01-160
Reply brief filed by Airport Communities Coalition (ACC) and Citizens Against Sea-Tac Expansion (CASE) with the Pollution Control Hearings Board (PCHB), PCHB No. 01-160, in support of their Request for Certificate of Appealability and Application for Direct Review by the Court of Appeals. Filed January 30, 2002. Argues under RCW 34.05.518(3)(b) that detrimental delay, fundamental -
2002-01-30
EXH 411: NHC Letter to US Army Corps Engineers Low Streamflow Analysis Miller Creek Walker Creek Des Moines Creek
A January 2002 letter from Northwest Hydraulic Consultants to the U.S. Army Corps of Engineers challenges the Port of Seattle's December 2001 Low Streamflow Analysis related to Sea-Tac Airport's third runway development. The letter identifies critical flaws in hydrologic modeling of Miller, Walker, and Des Moines Creeks, including double-counting of groundwater discharges, flawed seepage modeling methodology, and failure to account for construction impacts on stream low flows. The consultants argue these errors cause the Port to substantially underestimate the project's negative impacts on local stream flows. -
2002-01-30
EXH 248: NHC Letter to USACE — ACC Technical Review Low Streamflow Analysis, Miller, Walker & Des Moines Creeks
A January 2002 technical letter from Northwest Hydraulic Consultants challenges the Port of Seattle's December 2001 Low Streamflow Analysis for SeaTac Airport, identifying serious modeling errors that led to underestimated impacts on Miller, Walker, and Des Moines Creeks. Key flaws include double-counting of groundwater discharges in the Miller Creek model, inconsistent methodology for assessing embankment seepage, and failure to account for updated construction methods. The letter was submitted to the U.S. Army Corps of Engineers on behalf of the Airport Communities Coalition. -
2002-01-28
EXH AR027041: Photographs by Peter Eglick During Site Visit on January 28, 2002
Photographs taken by Peter Eglick during a site visit on January 28, 2002, filed as part of the Administrative Record (AR 027041–027043). The images show ground-level views of a dark gravelly or paved surface with water pooling and streaking, possibly documenting stormwater, contamination, or site conditions at or near Sea-Tac Airport. -
2002-01-23
EXH AR031469: Review of Third Runway Embankment Fill Monitoring Plan, 401 Certification Condition E.3, Port Of Seattle, November 2001
Internal memo from Ching-Pi Wang to Ann Kenny (cc: Jeannie Summerhays, Steve Alexander), dated January 23, 2002, reviewing the Port of Seattle’s Embankment Fill Monitoring Plan (EFMP) for the Third Runway, 401 Certification Condition E.3. Comments cover requirements for logic tree flow diagrams for tiered sampling and staged screening (groundwater, seepage), statistical methods for baseline -
2002-01-23
EXH AR004644: Letter from Michael P. Witek (Helsell Fetterman) to Presiding Officer Cottingham Re: ACC v. Ecology and Port Of Seattle, No. 01-160, with Wallula Power Project Site Certification Cover Sheet and 50 C.F.R. §402.02
Letter dated January 23, 2002 from attorney Michael P. Witek of Helsell Fetterman to Presiding Officer Kaleen Cottingham of the Pollution Control Hearings Board (PCHB) in Airport Communities Coalition v. Department of Ecology and Port of Seattle, No. 01-160. Transmits two enclosures inadvertently omitted from Exhibit D to the Second Declaration of Michael P. Witek -
2002-01-23
EXH AR004654: Declaration of Jeff Kray — PCHB No. 01-160, ACC v. Ecology and Port Of Seattle
Declaration of Jeff Kray, Assistant Attorney General of Washington, Ecology Division, filed January 23, 2002 in PCHB No. 01-160 before the Pollution Control Hearings Board. Airport Communities Coalition (ACC) and Citizens Against Sea-Tac Expansion (CASE) are appellants against State of Washington Department of Ecology and Port Of Seattle. Attaches two documents: (1) Amended Final Findings