Skip to content
  • STNI
  • Statistics
    • Ops and Passengers
      • King County International Airport (Boeing Field) Annual Operations
    • Financials
    • Aviation fuel uplift in the State of Washington 2018 – 2025
      • Aviation Fuel Tax Revenue in the State of Washington 1983-2025
      • Aviation Fuel Uplift at Sea-Tac Airport
    • Air Quality Monitoring
    • Flight Tracking
      • Flow and Flight Tracks
      • Five Year Comparison
      • Busiest Hours and Days
    • SEL Noise Reports & Graphs
      • About The Permanent Noise Monitors
      • Minutes of Quiet by Noise Monitor
      • Noise Events mapped
      • Noise Events (SEL)
    • Runways
    • Employees
    • Real Estate
      • Port Properties and Trees mapped
    • Parking
  • Events
  • Protest
    • Regular Events
    • Policy
      • Legislative Agenda 2027
      • Airport mitigation for the twenty first century
      • Port Dracula
    • Complain about a particular flight
    • Advocacy Organizations
    • Media Outlets
    • People
    • The Port of Seattle
      • Commission Meetings
      • Public Records Requests
      • StART
      • Highline Forum
    • Contact Your Electeds
  • Resources
    • FAQs
      • FAA Occurrences/Accidents/Indents
    • The SAMP
      • SAMP Public Comment Template
        • Two versions of Appendix K: NEPA/SEPA 2018 vs 2023
      • SAMP NTP: 31 projects by the numbers
      • SEPA Draft EIS (2026)
      • SAMP Record of Decision/FONSI (2025)
      • SAMP Draft EA (October 2024)
      • 2018 Scoping
    • Port Packages
      • Port Package Property Costs
      • Port Packages mapped
      • The Port Package Explainer
      • So you want a (first-time) Port Package? Start here
      • Port Package Looker Upper
      • How do I determine if I have a Port Package or Avigation Easement?
      • Progress on Port Package Update legislation
      • Having a Port Package Problem?
      • Port Package Site Visit Follow-Up
    • Document Library
    • Explainers
      • The Airport Law Cheat Sheet
      • The Grant Explainer
    • External Articles
    • History
      • Timeline
      • The Sea-Tac Communities Plan
        • Sea-Tac Communities Plan – Planning Maps
      • PSRC Third Runway Decision Process
    • Studies
    • Videos
  • Stories
  • Mission
  • Subscribe
  • Contact
Scroll down to content

Get InformedStay Informedx

I understand that you will never share my information with anyone, you will only use it to keep me updated on relevant events and that I may unsubscribe at any time.

STNI

STNISea-Tac Noise.Info

  • Solve for Sea-Tac. Solve for every airport.
  • Since 2016, working to obtain justice for everyone living under the flight path.
  • Less Noise. Cleaner Air. Better Public Health. Compensation.
  • Everything you think you know about the airport is wrong.

TagEcology(788)

Advanced Search Options

  • Dates
  • Media
    • External Articles
    • Images
    • PDFs
    • Video
    • Audio
  • Order By
  • 2001-04-17

    Documents catalogued as published in 2001

    This is a catalogued index of documents from 2001 related to the proposed Third Runway at Seattle-Tacoma International Airport, covering regulatory filings, public comments, and environmental studies. It includes records from agencies such as the Department of Ecology, the Corps of Engineers, and King County, addressing topics like stormwater management, NPDES permits, groundwater studies, and the impact of the February 2001 Nisqually Earthquake on airport structures. The catalog serves as a reference guide directing researchers to archival notebooks and specific shelf locations where the full documents are stored.
    TagsACC, Army Corp of Engineers, Ecology, RCAA, Sea-Tac Airport, Third RunwayFolderRCAA
  • 2001-04-17

    EXH AR029155: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Management Meeting Final Draft Notes, April 17, 2001

    Final draft meeting notes from April 17, 2001 management meeting on 401 Permit Decision-Making for Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees include Ray Hellwig, Ann Kenny, Kevin Fitzpatrick (Dept. of Ecology), David Masters (King County), Michael Cheyne, Elizabeth Leavitt, Keith Smith (Port Of Seattle), Kate Snider
    TagsACC, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third RunwayFolderBox 11
  • 2001-04-16

    EXH AR029152: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Minutes, April 16, 2001

    Final draft meeting notes from April 16, 2001 technical meeting on 401 Permit Decision-Making for Sea-Tac Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port of Seattle), Kelly Whiting (King County), Alan Black (HNTB), Paul Fendt and Tom Atkins
    TagsACC, Des Moines Creek, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Third RunwayFolderBox 11
  • 2001-04-11

    Exhibit 233: NHC Letter to Ecology — Review of Sea-Tac Airport Low Streamflow Analysis

    In an April 2001 letter to the Washington State Department of Ecology, Northwest Hydraulic Consultants raised serious concerns about the adequacy of a low streamflow analysis conducted for the proposed third runway expansion at Seattle-Tacoma (Sea-Tac) Airport. The firm argued that Ecology's March 2001 review memo effectively endorsed the study's methods and conclusions without addressing significant technical flaws, including the use of future rather than existing basin conditions and the failure to account for impacts from gravel mining, lagoon lining programs, and embankment seepage. The consultants, representing the Airport Communities Coalition, requested that Ecology revisit its review, consider all submitted technical comments, and require the airport's applicant to formally respond to outstanding concerns before any regulatory certification was granted.
    TagsACC, Des Moines Creek, Ecology, Pollution Control Hearings Board, Stormwater, Third RunwayFolderBox 08
  • 2001-04-11

    Summary of Correspondence and Documents Related to Agreed Order Materials, Department of Ecology and Port Of Seattle, 2001

    This document summarizes correspondence and records related to environmental cleanup efforts at Seattle-Tacoma International Airport, covering the period from 1997 to 2001. It details how Governor Locke conditioned his 1997 certification for the airport's third runway expansion on the Port of Seattle completing a study of decades-worth of hazardous waste contamination in the soil and groundwater at the site. The records also trace the lengthy negotiations between the Port and the Washington State Department of Ecology to establish an Agreed Order under the Model Toxics Control Act, which was ultimately signed in May 1999.
    TagsEcology, Model Toxics Control Act, Port Of Seattle, Sea-Tac Airport, Third RunwayFolderThird Runway
  • 2001-04-11

    EXH AR023621: Ecology Letter to Kevin Stock re Agreed Order #97TC-N122 401 Certification Third Runway

    In this April 11, 2001 letter, Washington State Department of Ecology Director Tom Fitzsimmons responds to attorney Kevin Stock regarding concerns raised by the Airport Communities Coalition (ACC) about the Port of Seattle's proposed Third Runway. Ecology agrees to host a technical meeting with ACC experts to examine whether Third Runway infrastructure could create pathways for contaminants from the Airport Operations and Maintenance Area (AOMA) to proposed runway sites, but declines to halt the 401 water quality certification process pending completion of a separate groundwater study. Ecology assures the ACC that it will not approve or deny the Third Runway projects until a 'pathway' analysis addressing contamination concerns is completed.
    TagsACC, Des Moines Creek, Ecology, Pollution Control Hearings Board, Third Runway, Water QualityFolderBox 10
  • 2001-04-09

    EXH AR029148: 401 Permit Decision-Making Technical Meeting — Sea-Tac Airport Third Runway, April 9, 2001

    Revised draft meeting notes from April 9, 2001 technical meeting on 401 Permit Decision-Making for Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port of Seattle), Kelly Whiting (King County), Alan Black (HNTB), Paul Fendt and Tom
    TagsACC, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third RunwayFolderBox 11
  • 2001-04-04

    EXH AR029145: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Final Draft Meeting Notes, Low Flow Analysis

    Final draft meeting notes prepared by Rachel McCrea of Floyd & Snider Inc. from a April 4, 2001 technical meeting on low streamflow impact analysis for the Sea-Tac Airport Third Runway 401 Permit Decision-Making process. Attendees included representatives from Washington Dept. of Ecology (Ann Kenny, Kevin Fitzpatrick, Dave Garland), King County (Kelly Whiting), EarthTech (Rick
    TagsACC, Ecology, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third Runway, Water QualityFolderBox 11
  • 2001-03-30

    EXH AR023618: Letter Kevin L. Stock (Helsell Fetterman) to Dir. Tom Fitzsimmons (Ecology) Re: 1999 Agreed Order & 401 Certification Process

    In this March 30, 2001 letter, attorney Kevin L. Stock of Helsell Fetterman writes to Washington State Department of Ecology Director Tom Fitzsimmons on behalf of the Airport Communities Coalition, confirming agreements reached at a March 27 meeting regarding Sea-Tac Airport expansion. The letter asserts that Ecology's 1999 Agreed Order with the Port of Seattle must be fulfilled before a Section 401 water quality certification can legally be issued, and confirms Ecology's commitment to hold a follow-up technical meeting with key staff and legislators present. The ACC argues that strong scientific and legal grounds preclude issuing a defensible 401 certification until the Port completes its obligations under the Agreed Order.
    TagsACC, Airport Communities Coalition, Ecology, Pollution Control Hearings Board, Port Of Seattle, Third RunwayFolderBox 10
  • 2001-03-28

    EXH AR023824: Draft Technical Meeting Notes – 401 Permit Decision-Making, STIA Third Runway, Mar 28, 2001

    These draft meeting notes from March 28, 2001 document a technical meeting regarding the 401 Permit Decision-Making process for Sea-Tac International Airport's Third Runway project. The meeting covered feedback on stormwater management deliverables, including corrections to hydrological modeling tables and figures, as well as scoping discussions for upcoming deliverables related to vault structural feasibility and maintenance documentation. Representatives from the Department of Ecology, King County, Port of Seattle, and several consulting firms attended, with follow-up meetings scheduled for early April 2001.
    TagsACC, Ecology, King County, PCHB, Pollution Control Hearings Board, Port Of Seattle, Third RunwayFolderBox 10

Posts pagination

Page 1 … Page 50 Page 51 Page 52 Page 53 Page 54 … Page 79
Sidebar On/Off

Upcoming Events

  • Part 150 NCP Workshop — Burien
    Add to CalendarMSaturday Oct 17: 10:00am

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]
  • Part 150 NCP Workshop — SeaTac
    Add to CalendarMMonday Oct 19: 6:00pm

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]
  • Part 150 NCP Workshop — Des Moines
    Add to CalendarMTuesday Oct 20: 6:00pm

    Attend a Port of Seattle open house on the Part 150 Study Noise Compatibility Program (NCP). The Part 150 program determines the noise boundary around the airport and opportunities for noise mitigation such as sound insulation.

    [...]

[See all...]


Issues

Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already hear, but you’re probably not aware of what it all means. Here’s what you need to know.
read more...

Read This!

As the source for federal transportation grants, the Puget Sound Regional Council was charged with developing a system to meet the growing need for commercial aviation. When the search for a second airport failed, they authorized the Port of Seattle to build the Third Runway, with a mandate to develop a noise abatement and mitigation program. In their effort to stop the Third Runway, the ACC argued over every detail of the Port's efforts--including property buyouts and sound insulation. The dispute was meant to be settled by a three member Expert Arbitration Panel. This is their final report. It finds 2-1, that the Port's program was insufficient in several respects. Despite that, funding for the Third Runway was approved by the PSRC, and the 'Port Package' program, proceeded largely unchanged. Expert Arbitration Panel's final decision finding that the Port of Seattle had not shown sufficient reduction in real on-the-ground noise impacts to satisfy noise reduction conditions required for approval of a third runway at Sea-Tac International Airport. The majority decision concluded the Port's noise abatement programs were insufficient despite being impressive in scope.
continue...

  • Sea-Tac Noise.Info
  • Connect with STNI

    • Subscribe
    • Port Package Problem?
    • Donate
    • Podcast
    • Socials
      • Facebook
      • X (Twitter)
      • Bluesky
      • Instagram
  • Learn

    • Frequently Asked Questions
    • Explainers
    • Youtube
    • Research Requests
    • Complain about one flight
  • Goals

    Fulfill the promises of 1976:
    • Compensation
    • Reduced noise
    • Improved air quality
    • Environmental remediation
Login/Register
©2026•Data Privacy

Message

We use cookies to provide basic functionality. We also provide access to search engines in order to provide site analytics. We do not sell or share your data.
V V