Skip to content
  • STNI
  • Statistics
    • Ops and Passengers
      • King County International Airport (Boeing Field) Annual Operations
    • Financials
    • Aviation fuel uplift in the State of Washington 2018 – 2025
      • Aviation Fuel Uplift at Sea-Tac Airport
    • Air Quality Monitoring
    • Flight Tracking
      • Flow and Flight Tracks
      • Five Year Comparison
      • Busiest Hours and Days
    • SEL Noise Reports & Graphs
      • About The Permanent Noise Monitors
      • Minutes of Quiet by Noise Monitor
      • Noise Events mapped
      • Noise Events (SEL)
    • Runways
    • Employees
    • Real Estate
      • Port Properties and Trees mapped
    • Parking
  • Events
  • Protest
    • Regular Events
    • Legislation 2026
    • Complain about a particular flight
    • Advocacy Organizations
    • Media Outlets
    • People
    • The Port of Seattle
      • Commission Meetings
      • Public Records Requests
      • StART
      • Highline Forum
    • Contact Your Electeds
  • Resources
    • FAQs
      • FAA Occurrences/Accidents/Indents
    • The unSustainable Airport Master Plan
      • SAMP Public Comment Template
        • Two versions of Appendix K: NEPA/SEPA 2018 vs 2023
      • SAMP NTP: 31 projects by the numbers
      • SEPA Draft EIS (2026)
      • SAMP Record of Decision/FONSI (2025)
      • SAMP Draft EA (October 2024)
      • 2018 Scoping
    • Port Packages
      • Port Package Property Costs
      • Port Packages mapped
      • The Port Package Explainer
      • So you want a (first-time) Port Package? Start here
      • Port Package Looker Upper
      • How do I determine if I have a Port Package or Avigation Easement?
      • Progress on Port Package Update legislation
      • Having a Port Package Problem?
      • Port Package Site Visit Follow-Up
    • Document Library
    • Explainers
      • The Airport Law Cheat Sheet
      • The Grant Explainer
    • External Articles
    • History
      • Timeline
      • The Sea-Tac Communities Plan
        • Sea-Tac Communities Plan – Planning Maps
      • PSRC Third Runway Decision Process
    • Studies
    • Videos
  • Stories
  • Mission
  • Subscribe
  • Contact
Scroll down to content

Get InformedStay Informedx

I understand that you will never share my information with anyone, you will only use it to keep me updated on relevant events and that I may unsubscribe at any time.

STNI

STNISea-Tac Noise.Info

  • Solve for Sea-Tac. Solve for every airport.
  • Since 2016, working to obtain justice for everyone living under the flight path.
  • Less Noise. Cleaner Air. Better Public Health. Compensation.
  • Everything you think you know about the airport is wrong.

TagEcology(797)

Advanced Search Options

  • Dates
  • Media
    • External Articles
    • Images
    • PDFs
    • Video
    • Audio
  • Order By
  • 2001-05-03

    EXH AR018225: Draft Memorandum — Outstanding Issues for Port Resolution (Third Runway Natural Resource Mitigation Plan)

    Draft memorandum dated April 25, 2001 from Katie L. Walter of Shannon & Wilson, Inc. to Ann Kenny and Erik Stockdale of Washington Department of Ecology, regarding outstanding issues for Port Of Seattle resolution on the Natural Resource Mitigation Plan for Sea-Tac Airport proposed Third Runway. Forwarded by Ann Kenny to Raymond Hellwig on May
    TagsACC, Auburn Wetland, Ecology, Miller Creek, Pollution Control Hearings Board, Port Of Seattle, Third Runway
  • 2001-05-01

    Model Toxics Control Act Cleanup Regulation: Process for Cleanup of Hazardous Waste Sites

    This Washington State Department of Ecology fact sheet explains how the Model Toxics Control Act (Initiative 97, 1989) governs the cleanup of hazardous waste sites in Washington, outlining who is liable, how sites are identified, and the options available for conducting cleanups. Potentially liable parties — including past and present owners, operators, and those who transported or disposed of hazardous substances — may clean up sites independently or work cooperatively with Ecology through formal agreements such as consent decrees. Note: this document concerns hazardous waste site cleanup regulation and does not contain information related to Sea-Tac Airport noise policy.
    TagsEcology, Model Toxics Control Act, MTCA, RCW, WAC
  • 2001-05-01

    EXH AR029163: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Notes, May 1, 2001

    Final draft meeting notes from a 401 Permit Decision-Making technical meeting on May 1, 2001, regarding Sea-Tac International Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port Of Seattle), Kelly Whiting (King County), Paul Fendt and Tom Atkins (Parametrix),
    TagsACC, Ecology, King County, Pollution Control Hearings Board, Port Of Seattle, Stormwater, Third Runway
  • 2001-05-01

    EXH AR031166: Wetland Photographs and Maps — Master Plan Update Improvements, Sea-Tac Airport

    Wetland photographs and maps prepared by Parametrix, Inc. for Port Of Seattle, May 2001, as part of the Master Plan Update Improvements for Seattle-Tacoma International Airport. Document AR031166 includes a Wetlands Atlas covering North and West Sides of Sea-Tac Airport, with 15 map sections showing surveyed wetland boundaries, estimated wetland boundaries, and other estimated or
    TagsACC, Army Corp of Engineers, Ecology, Map, Pollution Control Hearings Board, Port Of Seattle, Sea-Tac Airport Master Plan
  • 2001-05-01

    Exhibit 2211: Email from Scott Bender to Katie Walter Regarding Hydrologic Impacts to Wetland 39

    Email dated 5/1/01 from Scott Bender to Katie Walter transmitting an attached memo describing Bender’s opinions about hydrologic impacts to Wetland 39. AR 034818, ECY00021952, Exhibit-2211. Document relates to Ecology environmental review processes involving wetland hydrology assessment.
    CategoriesCorrespondence TagsACC, Ecology, Environment, Pollution Control Hearings Board
  • 2001-04-30

    EXH 233: NHC Letter to Ecology — NPDES Permit Modification STIA IWS Design Criteria Detention Standards

    In this April 2001 letter, Northwest Hydraulic Consultants raised technical concerns on behalf of the Airport Communities Coalition regarding a proposed NPDES permit modification for Seattle-Tacoma International Airport. The firm identified two key issues: a lack of clear, enforceable design criteria for stormwater overflows from the airport's integrated wastewater system (IWS), and an inconsistency between the permit's stormwater detention standards and the stricter standards sought under Section 401 Certification for the Third Runway and Master Plan Update projects. The consultants recommended that the permit be revised and republished for public comment to address these gaps and ensure consistent, enforceable stormwater management requirements.
    TagsACC, Ecology, NPDES, Pollution Control Hearings Board, Stormwater, Third Runway
  • 2001-04-30

    EXH AR023204: Memo — Black River Quarry Aggregate Testing (TPH & Metals)

    A Port of Seattle memo from April 2001 summarizes environmental testing of rock aggregate imported from the Black River Quarry for use in the Third Runway embankment project. Testing by environmental consultant AMEC found petroleum hydrocarbons (TPH) and elevated copper levels in some samples, prompting operational changes at the quarry including equipment cleaning and discarding the first hundred tons of rock after asphalt recycling operations. Follow-up testing confirmed that contaminant levels fell below MTCA Method A cleanup standards, and the Port halted material imports from the quarry in mid-October 2000 pending resolution.
    TagsACC, Ecology, MTCA, Pollution Control Hearings Board, Port Of Seattle, Puget Sound, Third Runway
  • 2001-04-30

    EXH AR028046: Port Of Seattle Memo — Black River Quarry TPH and Metals Testing for Third Runway Embankment

    Port Of Seattle internal memo dated 04/30/01 from Beth Clark to Paul Agid (cc: Elizabeth Leavitt, Jim Thomson) regarding rock aggregate imported from the Black River Quarry (King County, Washington), owned by Stoneway Rock & Recycling, used in the Third Runway embankment during August–October 2000. Documents AMEC and City Transfer Inc. (CTI) chemical testing for
    TagsACC, Ecology, Elizabeth Leavitt, MTCA, Pollution Control Hearings Board, Port Of Seattle, Third Runway
  • 2001-04-26

    EXH AR034813: Email and Meeting Notes — Jim Kelley and Katie Walter, STIA Clarifications, April 12, 2001

    Email from Jim Kelley (Parametrix, Inc.) to Katie Walter (klw@shanwil.com) dated April 26, 2001, transmitting preliminary draft meeting notes from an April 12, 2001 meeting regarding STIA mitigation site clarifications. The 20-item meeting notes cover Auburn mitigation site hydroseeding, water levels, radius of influence on adjacent wetlands, biofiltration on NRMP Sheet 3.3, dispersal trench elevation
    TagsACC, Auburn Wetland, Ecology, Environment, Pollution Control Hearings Board
  • 2001-04-25

    EXH AR029160: Final Draft Meeting Notes – Low Flow Analysis, Sea-Tac Airport Third Runway, April 25, 2001

    Final draft meeting notes from April 25, 2001 low flow analysis technical meeting for the Sea-Tac International Airport Third Runway 401 Permit Decision-Making process. Attendees included Ann Kenny (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Joe Brascher (AquaTerra), Peter Schwartzman (Pacific Groundwater Group), and Kate Snider (Floyd & Snider Inc.).
    TagsACC, CASE, Ecology, Pollution Control Hearings Board, Port Of Seattle, Third Runway, Water Quality

Posts pagination

Page 1 … Page 50 Page 51 Page 52 Page 53 Page 54 … Page 80
Sidebar On/Off

Upcoming Events

  • StART SEA Stakeholder Advisory Round Table
    Add to CalendarMWednesday Aug 26, 5:00pm - 7:00pm
    Zoom (Virtual Meeting)
    START meetingagenda 2026826 final 0 pdf

    Meeting Objectives Introduce the primary feedback themes identified by StART members regarding StART’s Operating Procedures and determine areas that may warrant future discussion. 5:00 PM – Welcome Meeting Management Welcome Lead: Andrés Mantilla, Facilitator, Uncommon Bridges; Wendy Reiter, Airport Managing Director, POS 5:15 PM – Dinner: All participants eat. 5:30 PM – StART Operating Procedures

    [...]
  • Commercial Aviation Work Group
    Add to CalendarMThursday Sep 3, 10:00am - 1:30pm
    Virtual Meeting (Zoom)
    Cawg agenda sep 3 26 virtual pdf

    Meeting Agenda 10:00 a.m. – 10:15 a.m. | Welcome – Evan Nordby, Chair a. Introductions and Agenda Reviewb. Status of appointments and non-voting member invitationsc. Other updates as necessary 10:15 a.m. – 11:00 a.m. | Is it practical and legal to operate the western Washington [Puget Sound] airports as a single airport system? – Consultant

    [...]

[See all...]


Help study childhood asthma. Get free HEPA filter!

read more...

Issues

Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already hear, but you’re probably not aware of what it all means. Here’s what you need to know.
read more...

Read This!

As the source for federal transportation grants, the Puget Sound Regional Council was charged with developing a system to meet the growing need for commercial aviation. When the search for a second airport failed, they authorized the Port of Seattle to build the Third Runway, with a mandate to develop a noise abatement and mitigation program. In their effort to stop the Third Runway, the ACC argued over every detail of the Port's efforts--including property buyouts and sound insulation. The dispute was meant to be settled by a three member Expert Arbitration Panel. This is their final report. It finds 2-1, that the Port's program was insufficient in several respects. Despite that, funding for the Third Runway was approved by the PSRC, and the 'Port Package' program, proceeded largely unchanged. Expert Arbitration Panel's final decision finding that the Port of Seattle had not shown sufficient reduction in real on-the-ground noise impacts to satisfy noise reduction conditions required for approval of a third runway at Sea-Tac International Airport. The majority decision concluded the Port's noise abatement programs were insufficient despite being impressive in scope.
continue...

The Podcast!

Subscribe to the only podcast devoted to policies, politics, history, impacts for people living under the flight path everywhere. It’s definitely not just about noise!
  • Sea-Tac Noise.Info
  • Connect with STNI

    • Subscribe
    • Port Package Problem?
    • Donate
    • Podcast
    • Socials
      • Facebook
      • X (Twitter)
      • Bluesky
      • Instagram

    "Elena Austin, UWDEOHS, May 9, 2025" — , 2025

  • Learn

    • Frequently Asked Questions
    • Explainers
    • Youtube
    • Research Requests
    • Make a complaint
  • Goals

    Fulfill the promises of 1976:
    • Compensation
    • Reduced noise
    • Improved air quality
    • Environmental remediation
Login/Register
©2026•Data Privacy

Message

We use cookies to provide basic functionality. We also provide access to search engines in order to provide site analytics. We do not sell or share your data.
V V