TagSAMP(650)
Articles tagged with the Sustainable Airport Master Plan.
-
2024-02-01
Seattle-Tacoma International Airport SAMP Near Term Projects: Wetlands and Streams Report
This technical report, prepared by Parametrix for the Port of Seattle in February 2024, documents the wetlands and streams found at Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP) Near Term Projects. It covers the delineation of wetland and stream boundaries, assesses potential impacts to these aquatic areas from planned airport improvements, and outlines mitigation measures and permitting approaches to address those impacts. -
2024-02-01
Seattle-Tacoma International Airport SAMP Near Term Projects: Wetlands and Streams Report — Appendix A Background Information
This February 2024 technical report from the Port of Seattle documents the wetlands and streams located at and around Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP). It includes mapped locations of wetlands surveyed across multiple years (2006, 2014, and 2017) along with stream corridors such as Miller Creek, Des Moines Creek, and Walker Creek. Field hydrology monitoring data from 2020 is also provided, recording groundwater depth and soil saturation measurements to assess wetland conditions across the airport property. -
2024-02-01
Seattle-Tacoma International Airport SAMP Near Term Projects: Wetlands and Streams Report — Appendix A Background Information
This February 2024 technical report from the Port of Seattle documents the wetlands and streams located at and around Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP). It includes mapped locations of wetlands surveyed across multiple years (2006, 2014, and 2017) along with stream corridors such as Miller Creek, Des Moines Creek, and Walker Creek. Field hydrology monitoring data from 2020 is also provided, recording groundwater depth and soil saturation measurements to assess wetland conditions across the airport property. -
2024-02-01
Appendix M: Water Resources — Wetland and Stream Delineation Technical Report, Seattle-Tacoma International Airport SAMP Near Term Projects
This technical report, prepared by Parametrix for the Port of Seattle in February 2024, documents the wetlands and streams found within and around Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP) Near Term Projects. It covers the delineation of aquatic critical areas, assessments of potential project impacts on wetlands and waterways, proposed mitigation measures, and the permitting approach needed to address those impacts. The report also includes analysis of impervious surface changes and Federal Flood Risk Management Standard (FFRMS) compliance worksheets. -
2024-02-01
Appendix M: SAMP Near Term Projects: Water Resources Wetlands and Streams Report
This technical report, prepared by Parametrix for the Port of Seattle in February 2024, documents the wetlands and streams found at Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP) Near Term Projects. It covers the delineation of wetland and stream boundaries, assessments of potential impacts to these aquatic areas from planned airport projects, and proposed mitigation measures and permitting strategies to address those impacts. -
2024-02-01
Seattle-Tacoma International Airport SAMP Near Term Projects: Wetlands and Streams Report
This technical report, prepared by Parametrix for the Port of Seattle in February 2024, documents the wetlands and streams found at Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP) Near Term Projects. It covers the delineation of wetland and stream boundaries, assessments of potential impacts to these aquatic areas from planned airport projects, and proposed mitigation measures and permitting strategies to address those impacts. -
2024-02-01
Seattle-Tacoma International Airport SAMP Near Term Projects: Wetlands and Streams Report
This technical report, prepared by Parametrix for the Port of Seattle in February 2024, documents the wetlands and streams found at Seattle-Tacoma International Airport as part of the Sustainable Airport Master Plan (SAMP) Near Term Projects. It covers the delineation of wetland and stream boundaries, assesses potential impacts to these aquatic areas from planned airport improvements, and outlines mitigation measures and permitting approaches to address those impacts. -
The UnSustainable Airport Master Plan
Sea-Tac Airport is currently undergoing the largest and longest expansion in its history, collectively known as the Sustainable Airport Master Plan (SAMP). Some of it you can already <em>hear</em>, but you’re probably not aware of what it all means. Here’s what you need to know. -
2024-01-01
Hazardous Materials, Solid Waste, and Pollution Prevention Technical Report: Appendix F — Hazardous Materials and Solid Waste
This technical report, prepared by Landrum & Brown for the Port of Seattle in January 2024, covers hazardous materials, solid waste, and pollution prevention as part of the Sustainable Airport Master Plan's near-term projects at Seattle-Tacoma International Airport. It includes assessments of contaminated fuel farm sites, regulated building materials such as asbestos and lead in airport structures, and environmental investigation reports for fueling sites. Supporting attachments document findings from agencies like Washington State Ecology and surveys of specific airport buildings managed by tenants including United Airlines and Swissport. -
2024-01-01
Appendix H: Land Use Technical Report — Sustainable Airport Master Plan Near-Term Projects
This January 2024 Land Use Technical Report, prepared by Landrum & Brown for the Port of Seattle, examines how near-term construction projects at Seattle-Tacoma International Airport align with local and regional land use plans. It reviews existing and planned land uses in surrounding cities—including SeaTac, Des Moines, Burien, and Tukwila—and evaluates the potential land use impacts of proposed action alternatives. The report draws on key planning documents such as a 2018 Interlocal Agreement and the Puget Sound Regional Council's Vision 2050 to assess consistency with community goals.