TagPort Of Seattle(1843)
-
1999-08-11
EXH AR045628: Summary of Key Wetland Findings of the Sea-Tac Runway Fill Hydrologic Studies Report
Parametrix, Inc. summary (August 11, 1999) of key wetland findings from the Sea-Tac Runway Fill Hydrologic Studies Report (Pacific Groundwater Group 2000), prepared for the Port Of Seattle Master Plan Update Improvements JARPA review. Covers wetland delineation conservatism, limiting habitat characteristics of Miller Creek, Walker Creek, and Des Moines Creek, salmonid habitat significance, indirect embankment -
1999-08-01
EXH AR042630: Draft Wetlands Re-Evaluation Document — STIA Master Plan Update Improvements
Draft Wetlands Re-Evaluation Document prepared by Port Of Seattle in August 1999 for Seattle-Tacoma International Airport (STIA) Master Plan Update Improvements. Addresses new information on wetlands and aquatic resources affected by the planned new third runway and related improvements, not available during preparation of the 1996 Final Environmental Impact Statement (FEIS) or 1997 Final Supplemental -
1999-07-13
EXH AR042353: Evaluation of Retaining Wall/Slope Alternatives to Reduce Impacts to Miller Creek, Embankment Station 174+00 to 186+00, Third Runway, Sea-Tac International Airport
Report AR042353 prepared by HNTB, Hart Crowser Inc., and Parametrix for Port Of Seattle Aviation Program Management Group, evaluating retaining wall and slope alternatives to reduce impacts to Miller Creek at embankment station 174+00 to 186+00 for the Third Dependent Runway project at Sea-Tac International Airport. Transmitted July 13, 1999 by Barbara Hinkle to Tom -
1999-07-09
EXH AR042613: Third Runway Project, Borrow Areas 1, 3, and 4 — Projected Impacts to Wetlands
Memorandum dated July 9, 1999 from Reese P. Hastings and Michael J. Bailey, P.E. (Hart Crowser, Inc.) to Barbara Hinkle, Port Of Seattle, regarding Third Runway Project Borrow Areas 1, 3, and 4 and projected impacts to wetlands. Document J-4978-02 quantifies potential wetland resource impacts from excavation of borrow areas providing 7.9 million bank cubic -
1999-07-01
EXH AR042527: Subsurface Conditions Data Report — 404 Permit Support, Third Runway Embankment
Hart Crowser subsurface conditions data report prepared for HNTB Corporation and Port Of Seattle, project J-4978-06, July 1999, supporting 404 permit for Third Runway embankment at Sea-Tac Airport. Covers generalized geologic and hydrogeologic conditions, subsurface soil conditions, hydraulic conductivity estimates, slug testing, water level data, SPT borings (HC99-B31 through HC99-B47), test pits (HC99-TP1 through HC99-TP21, -
1999-06-30
EXH AR042505: STIA Ground Water Study — Conceptual Flow Model Presentation
Conceptual Flow Model Presentation for the Seattle-Tacoma International Airport (STIA) Ground Water Study, prepared by Associated Earth Sciences, Inc. and S.S. Papadopulos and Associates, Inc. for the Port of Seattle, presented to the Washington State Department of Ecology on June 30, 1999. Document outlines study area including Des Moines Creek, Miller Creek, Bow Lake, City -
1999-06-29
Exhibit 026593: Memorandum — Review of Draft De-Icing Dissolved Oxygen Report
Memorandum from Ken Ludwa of Parametrix, Inc. to Elizabeth Leavitt, dated June 29, 1999, reviewing the Draft De-Icing Dissolved Oxygen Report related to Sea-Tac Airport runway and taxiway acetate washoff. Comments address dissolved oxygen (DO) water quality standards (8 mg/L Class A, 9.5 mg/L Class AA) in Miller Creek and Des Moines Creek, NW Ponds, -
1999-06-13
Exhibit 2106: ATG MI Sea-Tac Third Runway — Email Chain on Water Quality Standards and 401 Permit Review for Des Moines Creek
Email chain (AR 033708–033710) among Washington State Department of Ecology staff Paula Ehlers, Tom Luster, and Raymond Hellwig, with ATG staff Tom McDonald and Joan Marchioro, dated June 1–13, 1999, regarding the Port Of Seattle third runway proposal and 401 water quality certification for Des Moines Creek. Discusses antidegradation requirements under Washington Water Quality Standards -
1999-05-12
EXH AR033705: Email Chain Re: Sea-Tac Third Runway Wetland Mitigation and Airport Bird Hazard Article
Email chain dated May 12, 1999 among Raymond Hellwig, Tom Luster, Erik Stockdale, and Paula Ehlers (Washington State Department of Ecology) regarding wetland mitigation strategy for the SeaTac Third Runway project (Port of Seattle). Tom Luster shares a Press Democrat article about Petaluma municipal airport’s Cross Creek subdivision wetland resolution with the FAA, proposing a -
1999-05-01
EXH AR042458: Agreed Order #97TC-N122 — State of Washington Ecology vs. Port Of Seattle, Sea-Tac Airport
Agreed Order #97TC-N122 issued by Washington State Department of Ecology under RCW 70.105D.050(1) directed to Port Of Seattle regarding hazardous substance contamination at Seattle-Tacoma International Airport (STIA). Documents thirteen contaminated sites within the Aircraft Operations and Maintenance Area (AOMA), a 1/2 square-mile area in the southeast quadrant of the airport, contaminated with jet fuel, gasoline,