EXH AR023831: Ecology Draft Recommendations Low Flow Technical Report & Operation Plan

This draft document from Washington State's Department of Ecology outlines requirements for a Low Flow Technical Report and a Low Flow Operation Plan related to MPU development activities. The Technical Report must include all calculations, engineering analyses, and hydrological studies needed to address low flow impacts, and must be stamped by a licensed Washington civil engineer. The Operation Plan must detail how stormwater and groundwater will be managed to mitigate those impacts, including maintenance procedures, performance standards, and methods to ensure those standards are met.

Notes

Draft document from Washington State Department of Ecology (Ecology) setting out recommendations for a Low Flow Technical Report and Low Flow Operation Plan in the context of the Sea-Tac Airport third runway MPU development. AR023831. The Low Flow Technical Report must comply with WAC 173-240 and the King County Design Manual, contain all calculations, assumptions, conceptual design analysis, and geotechnical and hydrological design, and be stamped by a licensed civil engineer registered in Washington State. The Low Flow Operation Plan must detail how stormwater and/or groundwater will be managed to mitigate low flow impacts, describe operation and maintenance of low flow augmentation facilities, identify performance standards, and list methods to ensure those standards are met.

V V