Notes
King County Department of Natural Resources review comments by M. Green on the July 2001 Low Flow Impact Analysis Flow Impact Offset Facility Proposal submitted by Parametrix Inc. for Port Of Seattle, supplementing the Comprehensive Stormwater Management Plan (SMP). Covers HSPF hydrologic modeling calibration accuracy, biological conclusions for salmonids, Des Moines Creek low flow statistics at S 200th Street Tyee Golf Course weir, Miller Creek and Walker Creek basin non-hydrologic changes (septic system removal, water withdrawal relinquishment), reserve storage vault design, flow augmentation period July 24–October 24 (91 days), 12.2 acre-feet reserve storage volume, and 2-year 7-day low flow targets (0.35 cfs existing, 0.25 cfs future). Exhibit AR022933 in the PCHB Third Runway EIS administrative record.