Notes
Miller Creek Relocation Plan prepared by Parametrix, Inc. for Landrum & Brown, December 1996, in connection with the proposed Master Plan Update improvements at Seattle-Tacoma International Airport. Document covers ecological assessment of Miller Creek including stream classification, fish habitat, hydrology, channel configuration, floodplain, and riparian vegetation. Addresses construction impacts from creek relocation on fish and wildlife, aquatic habitat, channel configuration, floodplain, and riparian vegetation. Includes mitigation goals, objectives, performance standards, proposed mitigation site description, ownership, rationale, constraints, and mitigation site plan covering site grading, project hydrology, creek hydraulics, channel alignment, roughness, side slopes, slope, flow velocity, and channel bottom width. Filed in context of Third Runway EIS (STIAMPU-EIS).