EXH AR045601: Evaluation of Perched Zone Interception and Possible Impacts to Wetland Hydrology, Borrow Area 3, Sea-Tac Third Runway

Notes

Hart Crowser draft report prepared for Port of Seattle, August 9, 2000 (J-4978-13), evaluating perched groundwater zone interception and potential wetland hydrology impacts from Borrow Area 3 excavation for the Sea-Tac Third Runway project. Addresses Pacific Groundwater Group (PGG, 2000) concerns commissioned by Washington State Department of Ecology regarding impacts to Wetland 29. Includes ModFlow groundwater modeling, perching layer hydrogeology, seepage face analysis, and revised mine plan preserving wetlands mapped by Parametrix (1999a). Topics include perched water-bearing zone, groundwater flow direction northwest to southeast, Borrow Areas 3 and 4, swale collection of seepage, and drawdown contour mapping.

V V