EXH AR035004: Attachment G — Wetland Acreage Impacts and Mitigation by Wetland Function

Notes

Attachment G table detailing wetland acreage impacts and mitigation credits by wetland function for in-basin and Auburn sites, related to the Sea-Tac Airport or associated project. Functions covered include Resident/Anadromous Fish (8.6 acres impacted), Passerine Birds (14.9 acres), Waterfowl (1.9 acres), Amphibians (9.8 acres), Small Mammals (13.2 acres), Exports Organic Matter (10.9 acres), Ground Water Exchange, Flood Storage (4.6 acres), and Nutrient/Sediment Trapping (16.3 acres). In-basin mitigation credits reference Miller Creek, Lora Lake shoreline restoration, Vacca Farm flood storage, and stormwater detention facilities. Auburn site credits include 65.38 site and 42.91 credit acres. Preservation of 23.55 acres near Borrow Area 3 excluded.

V V