EXH AR017893: Annual Stormwater Monitoring Report for STIA, July 1, 2000 Through June 30, 2001

Notes

Annual Stormwater Monitoring Report prepared by Port Of Seattle pursuant to Special Condition S2.E of the NPDES permit for Seattle-Tacoma International Airport (STIA), covering July 1, 2000 through June 30, 2001. Report covers 14 outfalls per permit condition S2.B; 61 grab and 59 composite samples from 22 storm events; 7-year cumulative totals exceed 400 samples and 168 storm events. Discusses airfield versus landside outfall constituent concentrations, BOD5, total recoverable metals (copper, lead, zinc), Washington State Water Quality Standards (WAC 173-201A), whole effluent toxicity (WET) testing, zinc runoff from galvanized metal rooftops of cargo buildings, stormwater treatment alternatives including CSF deciduous leaf compost (Stormwater Management, Portland OR) and soybean hulls (U.S. Department of Agriculture), biofiltration, and outfalls SDE4, SDN1up, SDN4, SDS3. Exhibit 114 in PCHB proceeding, AR 017893–017895.

V V