Notes
STIA Construction Site Stormwater Monitoring reports dated 10/16/2000 and 10/20/2000, samplers JL/RS and JB/RS. AR017259–AR017261. Documents turbidity and pH measurements at multiple construction sites including Logistics Site Development (unnamed catch basin, Tyee Pond, IWS Lagoon 3), MWS Lagoon 3 Construction treatment facility, Airfield Improvement (construction staging area, SDS-7, SDS-6, SDS3-594), Dobbs Flight Kitchen Remodel (SDE4-611, SDE4-607, SDE4-615, SDE4-601, SDE4-602, SDE4-911, SDE4-918), Air Traffic Control Tower (SDE4-948, SDE4-958), Feeder 104/204 Replacement (International Blvd curb), South Terminal Expansion Project North Ductbank (SDE4-118, SDE4-121, SDE4-111, SDE4-059, SDE4-064, SDE4-065B). Rainfall depths recorded as 0.51″ and 0.72″. Notes include: not pumping, 5+ ft freeboard on holding pond, flow est. 1 gps, ditch parallel to SR 509 onramp dry, turbidity 578 NTU, pH 10.83, d/s – u/s > 5 NTU, notified KL and DJ, covered by heavy steel plates, no construction activity, no disturbed soil.
