Notes
Final draft meeting notes from July 5, 2001 technical meeting on 401 Permit Decision-Making for the Sea-Tac Airport Third Runway, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees include Ann Kenny (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port of Seattle), Felix Kristanovich (Foster Wheeler), Paul Fendt and Tom Atkins (Parametrix), Alan Black (HNTB). Documents King County feedback on D7A&B (yellow) ‘Miller Creek’ submittal including corrections to 2006 model PCHRES 257 DVOL1, SDW1E pond staging verification, Summary of Basic Statistics table additions for SDN3A, SDW1A, SDW1B, Lake Reba, SR509, and MCRDF, SDN2X-4X flow frequency/duration curve inconsistency, and MCRDF duration plot. Includes schedule update table as of 7/5/01 and 7/23/01 tracking deliverables D1 through D10 (Ripples) with pink/yellow/green draft milestones. AR029198, ECY00014883, ECY00014884, ECY00014885.
