Notes
Final draft meeting notes prepared by Rachel McCrea, Floyd & Snider Inc., for the 401 Permit Decision-Making Technical Meeting on Sea-Tac International Airport Third Runway, May 7, 2001. Attendees included John Drabek and Ann Kenny (Dept. of Ecology), Keith Smith (Port Of Seattle), Kelly Whiting (King County), Felix Kristanovich (Foster Wheeler), Paul Fendt and Tom Atkins (Parametrix), Alan Black (HNTB). Topics covered: Deliverable 7B (154th Street Relocation) discussing effective impervious area changes above and below Miller Creek Detention Facility (net reduction of -4.77 below, net increase of +5.81 above); SDN2X, SDN3X, SDN4X, SDN3A basin model revisions; Point of Compliance curve at Miller Creek Regional Detention Facility per KCSWDM Level 2 and 1994 conditions target; Deliverable 5 (Table A-3) King County feedback; Governor’s Certification Requirement #5 regarding hydrologic divide acreages; schedule update as of 5/7/01 listing deliverables D1 through D9. ECY00013998-ECY00014000, AR 029167-AR 029169.
