EXH AR026273: Parametrix Transmittal & Responses to ACOE Questions Oct 26 2001 STIA MPU Natural Resource Mitigation

This November 2001 document from Parametrix, Inc. contains responses to U.S. Army Corps of Engineers questions regarding the Sea-Tac International Airport (STIA) Master Plan Update's natural resource mitigation project. It addresses technical questions about wetland mapping, watershed basin sizes, low-flow analysis, and cumulative wetland impacts across the Miller Creek, Walker Creek, and Des Moines Creek basins, showing projected wetland acreage reductions of approximately 3-4% with the project. The document also covers mitigation measures including wetland restoration sites and performance standards for invasive species control.

Notes

Parametrix, Inc. (Jim Kelley, Ph.D.) transmittal to Muffy Walker, U.S. Army Corps of Engineers (ACOE), dated November 2, 2001, project number 556-2912-001-03, for STIA MPU Natural Resource Mitigation. Responses address six ACOE questions on October 26, 2001 submittals: (1) air photo accuracy for Wetland B14 and Borrow Area 4 in 1980/1990/1964 photos; (2) Miller Creek basin (~5,140 acres), Walker Creek sub-basin (~540 acres), and Des Moines Creek basin (~3,750 acres) sizes with King County GIS land use data; (3) low-flow vault mitigation for Walker Creek and Pond F infiltration unsuitability per Hart Crowser memorandum May 23, 2001; (4) wetland/open water acreage table showing percent change for Miller Creek (-4.0%), Walker Creek (-3.3%), and Des Moines Creek (-3.8%) including Vacca Farm, Lora Lake, Des Moines Way Nursery, Bow Lake, and WSDOT SR509 Wetland B; (5) cattail performance standards (<10% cover) at Auburn mitigation site per Table 7-7.1; (6) SMP Table 6-2. AR 026273–AR 026275. Carbon copy to Elizabeth Leavitt, Port of Seattle.

V V