EXH 309: NHC Letter — ACC Technical Review Comments Stormwater Hydrology Hydraulics STIA Third Runway December 2000 SMP

In February 2001, Northwest Hydraulic Consultants submitted technical review comments to the U.S. Army Corps of Engineers and Washington State Department of Ecology on behalf of the Airport Communities Coalition, raising concerns about the stormwater management plan for the proposed third runway at Seattle-Tacoma International Airport. The letter identified multiple deficiencies, including dam safety issues, vault structures that violated King County depth requirements, inadequate methods for assessing standing open water durations, and insufficient erosion and sediment control planning. These issues, the consultants warned, could pose risks to both structural safety and safe airport operations if not addressed prior to project approval.

Notes

Northwest Hydraulic Consultants (NHC) letter dated February 15, 2001, submitted to U.S. Army Corps of Engineers (Jonathan Freedman) and Washington State Department of Ecology (Ann Kenny) on behalf of Airport Communities Coalition (ACC). Reviews the December 2000 Comprehensive Stormwater Management Plan (SMP) and Natural Resource Mitigation Plan (NRMP) by Parametrix Inc. for the Seattle-Tacoma International Airport Master Plan Update third runway project (Corps Reference No. 1996-4-02325). Raises dam safety concerns at SASA facility and vaults SDS7 and G1 (Basin SDW1A); notes violations of King County Surface Water Design Manual (KCSWDM) maximum vault depth of 20 feet for vaults SDS3, G1, SDN3, C1, M5, and C2; critiques inappropriate drain-time methodology for open water duration assessment versus continuous simulation; identifies Erosion and Sediment Control (ESC) deficiencies including clearing limits, tributary areas, pump sizing, and outer swale conflicts with seepage flow. References SMP Appendix D Exhibits C140, C151, C115, C24; Appendices L, O, R; King County core requirement 1.2.5.1; KCSWDM pg 5-37 and 5-38; Puget Sound precipitation conditions; and Port of Seattle Third Runway Embankment Construction Phase 4 plans (Work Order #101346, Project STIA-0104-T-01).

V V