EXH 265: Comprehensive Stormwater Management Plan Agency Review — STIA Master Plan Update Improvements

This December 2000 Comprehensive Stormwater Management Plan, prepared by Parametrix, Inc. for the Port of Seattle, outlines how Seattle-Tacoma International Airport planned to manage stormwater runoff as part of its Master Plan Update improvements. The plan covers water quantity and quality standards, drainage basin conditions, hydrologic modeling, and best management practices for both existing and future airport development areas. It addresses topics such as detention storage, treatment of industrial wastewater, wildlife safety near detention ponds, and protection of nearby waterways including Miller Creek and Des Moines Creek.

Notes

Exhibit 265 (AR 019463), prepared by Parametrix, Inc. for Port Of Seattle Seattle-Tacoma International Airport, December 2000. Comprehensive Stormwater Management Plan (CSMP) submitted to Washington State Department of Ecology for agency review in connection with the STIA Master Plan Update (MPU) improvements. Covers water quantity management standards (Level 1 and Level 2 flow control), water quality treatment BMPs, hydrologic analysis methodology using King County manual, stormwater detention design, industrial wastewater system (IWS), storm drainage system (SDS), Des Moines Creek low streamflow augmentation, Miller Creek buffer enhancement and stream channel restoration, Lake Reba pollutant removal, wildlife proximity to open detention ponds, dam safety, NPDES, SEPA, and future stormwater quality. Addresses drainage basins, conveyance systems, pump facilities, detention vaults, aquifer storage in embankments, and construction erosion control for Sea-Tac Airport third runway and MPU improvements filed in PCHB administrative record.

V V