NEPA Determination, Simple Categorical Exclusion for the Industrial Wastewater Treatment Plan Expansion Project at Seattle-Tacoma International Airport

The FAA has determined that Seattle-Tacoma International Airport's proposed expansion of its Industrial Wastewater Treatment Plant (IWTP) qualifies for a Simple Categorical Exclusion under the National Environmental Policy Act, meaning the project is not expected to have a significant impact on the environment. The project includes upgrades to the existing treatment plant infrastructure, construction of an aerated gravel bed, and updates to the adjacent Lagoon 3 site. This determination, issued November 14, 2025, clears the way for the required Airport Layout Plan update without the need for further environmental review.

Notes

FAA memorandum dated November 14, 2025, from Laura Sample (Seattle ADO Environmental Protection Specialist) to Steve Rybolt (SEA Senior ENV Program Manager) issuing a Simple Categorical Exclusion (CATEX) under NEPA and FAA Order 1050.1G Paragraph B-2.4.d for the Industrial Wastewater Treatment Plant (IWTP) expansion project at Seattle-Tacoma International Airport (SEA), Seattle, WA. Project components include updating the existing IWTP infrastructure in its current location, constructing an aerated gravel bed, and updating the adjacent Lagoon 3 site. The federal action triggering environmental review is an Airport Layout Plan (ALP) revision. The determination finds no extraordinary circumstances and categorically excludes the project from further environmental review under NPDES/water quality compliance and wildlife hazard provisions of FAA Advisory Circular 150/5200-33.

V V