Notes
A June 25, 2001 memorandum from Charles Ellingson of Pacific Groundwater Group to Keith Smith of Port Of Seattle presenting draft interim deliverables for Hydrus/Slice modeling of third runway fill at Sea-Tac Airport. The memo defines areas to be modeled by Hydrus/Slice instead of HSPF in the Miller Creek and Walker Creek basins, calculates effective recharge using two algorithms, and describes the selection of three representative hydrogeologic cross sections for Slice models. Miller Creek Basin pervious fill area totals 3,030,620 sq ft and Walker Creek Basin 450,630 sq ft.
