Exhibit AR023749: NHC Letter to Ecology re ACC Comments on Port Of Seattle Low Streamflow Analysis, Third Runway

This August 2001 letter from Northwest Hydraulic Consultants, submitted on behalf of the Airport Communities Coalition, raises technical concerns about the Port of Seattle's Low Streamflow Analysis for the proposed Sea-Tac Airport third runway project. The letter argues the Port's document is incomplete, inconsistent with the Stormwater Management Plan, and lacks critical design details needed to demonstrate that impacts to low streamflows in Walker, Des Moines, and Miller Creeks will be adequately mitigated. Key issues identified include missing sections in the analysis report, unaddressed impacts from airport expansion activities, conflicting information about proposed storage facilities, and failure to account for water transit losses during dry periods.

Notes

Northwest Hydraulic Consultants (NHC) letter dated August 6, 2001, submitted to Gordon White, Washington State Department of Ecology, on behalf of the Airport Communities Coalition (ACC), commenting on the Port Of Seattle’s July 23, 2001 Low Flow Analysis Flow Offset Facility Proposal for the Sea-Tac Airport third runway. NHC identifies the document as an incomplete draft lacking critical sections including the Introduction and Determination of Impacts to Streamflow, missing preliminary facility drawings, and inconsistent with the Stormwater Management Plan (SMP) regarding reserve storage vaults (NEPL, Cargo, SDN2X/4X, SDN3X, SDS3, SDS4, Vault F, C1, C2, G1). Comments address low-flow impacts to Miller Creek, Des Moines Creek, and Walker Creek; transit losses by evaporation, transpiration, and seepage; Industrial Wastewater System lagoon linings; and future airport business park development in the upper Des Moines Creek Basin. Transmitted via email by Andrea Grad, paralegal at Helsell Fetterman, to Ann Kenny, Raymond Hellwig, and others. AR 023749, PCHB Third Runway EIS record.

V V