Notes
Exhibit AR 026432–AR 026433 contains two figures related to wastewater flow data in the Bellingham and Midway Sewer District area. Figure 1 is an outflow hydrograph for the City of Bellingham Post Point wastewater treatment plant covering December 2001–January 2002, showing daily plant outflow in million gallons per day (mgd), prepared by Water Resources Consulting LLC. Figure 2 is a circular flow recorder chart from Midway Sewer District treatment facility showing flow as percent of maximum hydraulic capacity (18 mgd); a storm on November 14, 2001 caused flow to increase from 8 to 18 mgd in 3 hours, with recorded rainfall of 0.44 inches on 11/12/01, 2.60 inches on 11/13/01, and 1.61 inches on 11/14/01.