Notes
Deliberative internal email chain dated July 27, 2001, from Erik Stockdale to Ann Kenny, forwarded to Katie Walter, transmitting draft language for additional mitigation on Miller Creek related to SeaTac 3rd Runway construction. Ecology determined that ‘temporary’ wetland impacts (up to 2.05 acres, including 1.25 acres from stormwater ponds) are permanent in nature and require additional in-basin mitigation in the Miller Creek basin. Draft proposes adding wetland A17b/c/d and Water D (2.64 acres wetlands, 0.16 acres Water D, combined 2.80 acres) to the Natural Resource Mitigation Plan (NRMP, December 2000), with 100-foot buffer, buffer restoration/revegetation plan, removal of homes/fill/septic systems, evaluation of hydrologic connection to Miller Creek, restrictive covenant, and potential FAA TRACON development consideration. Attachment A map of Wetland A17 Complex included. AR 034820–034822, ECY00017483–17485.