Notes
Handwritten meeting notes dated 3-22-01 (AR 018495–018497, Exhibit 192) from a meeting involving Kelly Whiting, Katie Walters, and others (SKW MIG at WLRD). Notes cover Pond D (discharge not modelled, meets flow standards, indirect impacts to wetlands, SDW1B, seasonal groundwater at 336 ft, infiltration facility 0.2 cfs), Pond F (discharges to Walker Creek via riprap outfall, 2yr=1.2 cfs, 100yr=10 cfs, 10 garden hoses=1 cfs, potential enlargement due to outwash soils), Pond G (pulls water from Pond C, discharge spreader above WL18, affects WL44a), drainage features not shown in NRMP plans, stormwater drawings labelled as 65% construction level documentation, flow spreader within wetland, Miller Creek berm at Vaca Farm, geotextile lifespan, channel dynamics, and sewer easement maintenance impacts.
