Notes
Port Of Seattle map showing all near-term projects included in the Sea-Tac Airport Sustainable Airport Master Plan (SAMP) Environmental Review. Projects are categorized as Second Terminal, Cargo Expansion, Airfield Operational, Airfield Safety/Standards, and Sustainable Aviation Fuel. Airside projects include Taxiway A/B Extension (A01), Runway 16R-34L Blast Pads (A02), Taxiway B 500′ Separation & RIM Mitigation (A04), North Hold Pad (A05), Runway 34L Highspeed Exit (A06), Taxiway D Extension (A07), and Hardstands (A08, A09). Landside projects include NAE Relocation (L01), Elevated Busway & Stations (L02), Second Terminal Roads/Curbside (L03), Main Terminal North GT Lot (L04), North GT Holding Lot (L05), and Employee Parking Structure (L07). Terminal projects include North Gates (T01) and Second Terminal & Parking (T02). Cargo projects include Cargo 4 South Redevelopment (C01), Off-site Cargo PH 1 L-Shape (C02), and Off-site Cargo PH 2 L-Shape (C03). Airport/Airline Support projects include Fuel Farm Expansion (S01), Primary ARFF (S02), Secondary ARFF (S03), Fuel Rack Relocation (S04), Triculator (S05), Consolidated De-icing Tanks (S06), Westside Maintenance Campus (S07), Airline Support north (S08), Airline Support west (S09), and Centralized Rec. & Dist. Center (S10).
