Third Runway Construction Traffic: Fill Dirt Complaints and Data Report, March 2005

Notes

Seattle-Tacoma International Airport Third Runway Data Report for March 2005, documenting truck haul activity from Auburn, Dupont, Kangley, and Sumner pits: 858,745 tons of fill delivered, 28,052 truck loads, 1,441,824 truck miles over 23 hauling days. Includes Washington State Patrol enforcement data (264 trucks pulled over, 9 overweight citations), 119 damage claims since June 2004 haul start, and embankment construction status (60% complete). Also includes November 2004 correspondence: fax from Rep. Dave Upthegrove’s legislative assistant Rachel Smith to Lt. Reandeau (WSP, fax 425-957-2346) forwarding a letter from Lawrence J. Corvari, President of the Regional Commission on Airport Affairs (RCAA), complaining about uncovered truck loads, speed-limit violations, spilled materials, and overweight rigs on SR 518 and SR 509 related to third runway fill dirt hauling.