Notes
Appendix A background information from the Seattle-Tacoma International Airport (Sea-Tac Airport) Sustainable Airport Master Plan (SAMP) Near Term Projects Wetlands and Streams Report, prepared by Parametrix for the Port Of Seattle, February 2024 (project no. 553-2912-002). Contains Figure A-1 mapping Port of Seattle Natural Resources Geodatabase wetlands and streams data across multiple survey years (2006 pre/post Third Runway, 2014, 2017) and named water features including Walker Creek, Des Moines Creek West, Des Moines Creek East, Gilliam Creek, Miller Creek, and Miller Creek East in King County, WA. Also includes 2020 SAMP hydrology monitoring field data tables with depth-to-water measurements (surface water, water table, saturation) at soil pit locations SP-WLD-1, SP-WLD-2, SP-WLG12-2, SP-WLG12-3, SP-WLG12-8, SP-WLG12-9 and hydrology points Hydro 1–10, collected on 3/13/2020 and 3/25/2020.
