Notes
Port of Seattle letter dated July 23, 2001 to Ann E. Kenny, Washington State Department of Ecology, Northwest Regional Office, summarizing low streamflow impact analysis and flow impact offset facility proposal for Seattle-Tacoma International Airport Master Plan Update projects. Prepared by Parametrix, Inc. Analysis covers summer low streamflow impacts to Des Moines Creek, Miller Creek, and Walker Creek using calibrated HSPF hydrological models. Proposes underground stormwater detention vaults releasing water at 0.10 cfs (Des Moines Creek), 0.13 cfs (Miller Creek), and 0.09 cfs (Walker Creek) during summer low flow periods (July 24–October 24 / August 1–October 31). Vault sizes: 12.2 acre-feet, 18.8 acre-feet, 15.0 acre-feet respectively. Document references 2-year 7-day low flow, 401 permit, Comprehensive Stormwater Management Plan, King County, Floyd Snider McCarthy. AR 051729.
