EXH AR049975: Post-Earthquake Reconnaissance and Photo Documentation — STIA Third Runway Project

Notes

Memorandum from Michael Bailey, P.E., Hart Crowser, Inc. to Jim Thomson, P.E., HNTB Corporation, dated March 26, 2001, documenting post-earthquake reconnaissance at the Sea-Tac Airport (STIA) Third Runway Project site (project J-4978-06) following the February 28, 2001, Nisqually earthquake. Two reconnaissance visits on March 1 and March 2, 2001 by Hart Crowser engineers Doug Lindquist and geologist Derek Ormerod inspected embankment fill constructed in 1998, 1999, 2000, and 2001, as well as proposed MSE (Mechanically Stabilized Earth) West and North wall locations. No evidence of ground movement, liquefaction, sand boils, lateral spreading, sloughing, heave, or tension cracks was observed. Includes 57 digital photographs, photo log notes, field observation notes, and Earthquake Reconnaissance Photo Location Maps (Figures 1–4) for the Port of Seattle.