Notes
Technical memorandum prepared by HNTB Corporation for the Port of Seattle and Parametrix, Inc. (June 15, 1999) analyzing temporary wetland impacts during Seattle-Tacoma International Airport Third Runway embankment construction. AR 042490. Covers storm water management during construction, temporary fill in wetlands west of runway embankment toe, impacts to Wetland 37 (Miller Creek basin) and Wetland 44 (Walker Creek basin), sedimentation ponds, erosion control fencing, collection and conveyance swales, dewatering, construction staging, Miller Creek North (MCN), Miller Creek South (MCS), Walker Creek Drainage, and Des Moines Creek Drainage basins. Describes wetland restoration post-construction including fill removal, drainage pattern restoration, hydroseeding, and replanting with native species.