EXH AR039950: Fill Material Alternative Delivery Method Study for Third Runway, Phase I — Seattle-Tacoma International Airport

Notes

HNTB-prepared Final Draft Phase I study (November 1996) for Sea-Tac Airport Third Runway fill material alternative delivery methods. Evaluates transport corridors including Corridor 1 (Des Moines Creek barge transfer and land conveyor), Corridor 2 (SR 509 conveyor, truck, rail), and Corridor 3 (SR 518 conveyor, truck, rail). Covers technical viability, construction/environmental permitting (local, state, federal), and economic feasibility of conveyors, barges, railroads, trucking, and hydraulic pipeline systems. Identifies permit issues, Associated General Contractors (AGC) meeting findings, and material transfer site field reviews.