EXH AR034954: Third Runway Soil Fill Quality Criteria

Notes

Port Of Seattle document establishing soil fill quality criteria for Third Runway embankment construction in 1998, covering approximately 820,000 cubic yards of fill material. Specifies Fill Borrow Material Types (Group 1, Group 2, Group 3) with sieve size gradation requirements (6″, 3″, ¾”, U.S. No. 4, U.S. No. 40, U.S. No. 200), MTCA Method A contamination standards, and certification requirements from licensed geotechnical engineers. Material sources include state-certified borrow pits, contractor-certified construction sites, and Port-owned property; prepared in response to Washington Department of Ecology request. AR 034954–034956.

V V