Exhibit 2056: Transmittal Form — STIA MPU Permitting, Revised References and Table 3.1-4 for Natural Resource Mitigation Plan

Notes

Transmittal form dated January 9, 2002, from Jim Kelley of Parametrix, Inc. to Ann Kenny at the Washington Department of Ecology NWRO (Northwest Regional Office), Project Number 556-2912-001-01-03, Project Name STIA MPU Permitting. Transmits: (1) Revised Section 8 References for the Natural Resource Mitigation Plan (NRMP, November 2001), correcting omitted citations; (2) Errata Sheet correcting reference call outs in the NRMP text; (3) Revised Table 3.1-4 summarizing wetlands disturbed during mitigation activities, correcting total acreage from 43.34 acres to 44.36 acres (pages 3-6 and 5-120), and correcting ‘Category III’ to ‘Category II’ on page 3-11 Section 3.1-5. Table 3.1-4 details temporary wetland impacts associated with mitigation excavation, temporary roads, and enhancement planting at sites including Vacca Farm, Auburn Areas 1–11, Tyee Valley Golf Course, Miller Creek buffer wetlands (A1, A2, A3, A4, A9–A17, R1–R17), Waters B, D, V1, V2, farmed wetlands FW 1–11, wetlands 18, 28, 37a, N8, N9, N10; vegetation types include forest, shrub, emergent, open water; AR 031660–AR 031662.

V V