EXH AR029187: 401 Permit Decision-Making, Sea-Tac Airport Third Runway — Technical Meeting Notes, June 18, 2001

Notes

Final draft meeting notes from a 401 Permit Decision-Making technical meeting for Sea-Tac International Airport Third Runway, held June 18, 2001, prepared by Rachel McCrea of Floyd & Snider Inc. Attendees included Ann Kenny and John Drabek (Dept. of Ecology), Kelly Whiting (King County), Keith Smith (Port Of Seattle), Felix Kristanovich (Foster Wheeler), Paul Fendt and Tom Atkins (Parametrix), and Alan Black (HNTB). Topics covered include King County feedback on Deliverable D7A Miller Creek (SDN2X-4X facility, SDW1B, SDW1A Pond G, RCHRES 257, flow frequency analysis, duration curves, POC measurement), Deliverable 9 Figures clarification, existing SMP text on low stream flow impacts and proposed mitigation (table 6-3A series, Low Stream Flow Report, Appendix D and Q), Governor’s Certification Requirement #5 hydrologic divide statement, and a schedule update table tracking deliverables D1 through D10 including pink/yellow draft submissions and King County feedback dates.

V V