EXH0622024406

PCHBPollution Control Hearings Board of the State of Washington

Water Quality Certification 01996-4-02325 _, ' Lf'Z5 {oq_ _'SlO _' Z? _' _4_)_ Page 16of23 _' ¢4_' _4¢_ "?Oq_ r-_,August X. 2001 • infiltration rate sampling and monitoring to evaluate !mrfo_ of the fill • establishmentof contingencymeasuresin case f_ doesnot meet performancestandards L Operational Stormwater Requirements: Avproved_Stormwater Plan: The Comprehensive Stormwater M_mag=nmnt Plan. Volurae_ 1 through 4, December 2000 as revised by the July 2001 Rnplaccment pages is the approved stonnwater management plan for this projecL It shall be implemented in its entirety, No changes to tim plan shall be _'_ without prior review and approval, The Port shall provide Ecology with draft proposed changes to the Plan no later than 60 days priorto the date it wishes to implcra_t a chang_ to the plan. The Port shall implement the project in accordance with the schedu]e provided in Table A-3 Only 2001). Any changes to the schedule must be reviewed and approved in advance by EColoFx. The Pot..,,L: '_1 provide Ecology with a draft revised sche__,de-no late_ than fi0 days prior to the date it wis_s to impl=a_nt the change to the schedulm The following facilities/projects listed in Table A-._ ,_Taly2001) do not have yet have stormwater treatment facilities proposed: XXX, If the Port deeia,._ m build a:._ ,_f these facilities/project the Port nmst submit conceptual drawings that _ the perfomwnce s_"_." _ .Jf _ the CSMP to Ecology for review and approval. P_trofitting of stonnwater managenamt facilities at th_ STIA shall occur at a ra_ comnamsumm wi:h the consu'uction…
V V