Comments on Stormwater, Hydrology, and Hydraulics Aspects of Proposed 3rd Runway and Related Development Actions at Seattle-Tacoma International Airport

Notes

Northwest Hydraulic Consultants submitted technical review comments to the U.S. Army Corps of Engineers and Washington State Department of Ecology on behalf of the Airport Communities Coalition regarding the December 2000 Comprehensive Stormwater Management Plan and Natural Resource Mitigation Plan for the proposed third runway at Sea-Tac Airport. The letter raises concerns about dam safety at proposed detention facilities and vaults, violations of King County stormwater design manual requirements for vault depth, inappropriate methodologies for assessing open water durations, and deficiencies in erosion and sediment control plans. The review identifies specific structural and safety risks with proposed vaults SDS7 and G1, and flags that construction had already begun without independent regulatory review.