Notes
Email from Ann Kenny to Katie Walter (cc: Raymond Hellwig, Erik Stockdale) dated July 31, 2001, transmitting Attachment X: NRMP Plan Set Revisions (AR018266, DOE 8/13/01 0567). The attachment lists prescriptive revision requirements for plan sheets in Appendix A (Miller Creek Relocation and Floodplain Enhancement) and Appendix B (Miller Creek In-stream and Buffer Enhancements), including revisions to sheets C3, C4, C7, C8, C9, C10, TE1–TE5, and L2. Requirements cover irrigation system design, grading plans showing no work in streams, woody debris anchoring with cable or hemp, steel anchors for logs, stream de-watering during re-grading, coir fabric lifts, geotextile biodegradable fabric, live stake density, stream diversion structures, flexible by-pass pipe, sump discharge to treatment pond, construction access restoration, hazardous materials management, and sediment migration prevention. Auburn site mitigation sequencing also referenced.