Notes
Internal Ecology meeting notes and talking points dated 8/16/2001 regarding the 401 Water Quality Certification issued for the Third Runway project at Sea-Tac Airport. Ecology staff prepared responses to Port Of Seattle concerns about the certification’s open-ended conditions, covering topics including NPDES major modification, stormwater retrofitting, wetland mitigation, Water Effects Ratio (WER) Study, Walker Creek sub-basin low-flow alternatives, acceptable fill criteria, and NPDES 402 permit linkage. Document notes Ecology is in ‘pre-litigation’ or ‘litigation prep’ mode and should not release information under the PDA (Public Disclosure Act) until clarification from AAGs. Also lists seven substantive conditions imposed by Ecology on Third Runway 401 WQ Certification dated 8/14/2001, including additional wetland mitigation, buffers around Borrow site 3, water quality monitoring, stormwater retrofitting, WER Study, and acceptable fill criteria.
