Notes
Email chain dated September 11, 2000 among Kevin Fitzpatrick, Peter Kmet, Chung K. Yee, Joan Marchioro, and Tom Luster of Washington State Department of Ecology (Water Quality Program, NWRO) regarding clean fill criteria language for the 401 Water Quality Certification on the Sea-Tac Third Runway project. Document marked ‘Deliberative Document Currently Exempt From Public Disclosure.’ Discusses revisions to certification conditions E6 (borrow sites), E7c.2(b) (EPA databases, Confirmed & Suspected Contaminated Sites Report), E7c.2(e) (fill material analysis for TPH and Priority Pollutants metals, MTCA Method A and Method B soil cleanup levels), and proposed E7c.2(f) (environmental professional requirement). Also addresses E7c.3 placement location reporting in quarterly as-builts. References Model Toxics Control Act (MTCA), Port of Seattle, AR 017282.
