WSDOT SR509 Phase 1 alignment noise barrier analysis summary

This 2019 WSDOT report analyzes noise barriers along the SR509 Phase 1 highway alignment near the Sea-Tac area, evaluating whether proposed sound walls meet feasibility and cost-reasonableness standards. Wall 3 was rejected because it could not achieve the required 5 dB noise reduction for nearby residents. Wall 4 met the technical noise-reduction threshold but was ultimately rejected because its estimated cost of $111,478 exceeded the allowable budget of $72,254.

Notes

This document summarizes noise barrier analysis for the WSDOT SR509 Phase 1 alignment, evaluating Walls 3 and 4 against feasibility and reasonableness criteria. Wall 3 failed feasibility criteria as the barrier could not achieve the required 5 dB insertion loss. Wall 4 passed feasibility criteria but failed reasonableness criteria because the wall cost ($111,478) exceeded the allowance ($72,254).