Sea-Tac Airport Third Runway Embankment Construction Earthwork (2002)

Aerial photograph showing large-scale earthwork and grading operations during construction of Seattle-Tacoma International Airport's third runway (Runway 16C/34C). The image shows the runway surface and surrounding excavated terrain, with the existing airport facilities and control tower visible in the background.

Notes

Aerial photograph showing large-scale earthwork and grading operations during construction of Seattle-Tacoma International Airport’s third runway (Runway 16C/34C). The image shows the runway surface and surrounding excavated terrain, with the existing airport facilities and control tower visible in the background.

V V