Report on Sea-Tac IWTP – AGB Site, Seattle-Tacoma International Airport, Sea-Tac, Washington

This August 2025 draft report by Haley & Aldrich, Inc., prepared for the Port of Seattle, presents geotechnical and hydrogeological findings for the Industrial Wastewater Treatment Plant (IWTP) Above Ground Basin (AGB) site at Seattle-Tacoma International Airport. The report covers subsurface soil and groundwater conditions, seismic hazard assessments, and engineering design recommendations for elements such as slopes, embankments, and excavation support. It serves as a technical reference to guide construction and infrastructure decisions at the airport site.

Notes

Geotechnical engineering report prepared by Haley & Aldrich, Inc. for Port Of Seattle on the Sea-Tac IWTP (Industrial Wastewater Treatment Plant) AGB Site at Seattle-Tacoma International Airport, SeaTac, Washington, file no. 0204661-002, dated August 2025 (draft). Prepared by Mike Espinoza P.E. and Blake Lytle-Goldstein L.G.; reviewed by Benjamin M. Blanchette P.E., Roy Jensen L.H.G., and Douglas D. Lindquist P.E., LEED AP. Covers regional geology, soil conditions, groundwater conditions, hydraulic properties, Lagoon 3 site subsurface review, seismic parameters and geotechnical hazards, environmental considerations, site preparation and grading, temporary and permanent slopes, embankment design, slope stability, embankment settlement, and support of excavation.

V V