Notes
Five-Year Project Report on the City of Des Moines Water Quality Monitoring Program, prepared by Herrera Environmental Consultants (Seattle, WA) for the City of Des Moines Surface Water Management Utility (805 South 219th Street, Des Moines, Washington 98198-6317), dated February 21, 2001. AR 025289/025290. Report covers water quality and habitat quality monitoring results for Des Moines Creek Basin, Massey Creek Basin, and North Fork McSorley Creek Basin. Parameters analyzed include temperature, pH, dissolved oxygen, conductivity, hardness, turbidity, total suspended solids, nutrients, metals, total petroleum hydrocarbons (TPH), and fecal coliform bacteria. Also includes hydrologic results, pollutant source tracking, and benthic invertebrate monitoring using Total Erosional Habitat Index (TEHI). Filed in PCHB Third Runway EIS administrative record.
